ALKALI FLATS PROJECT UPDATE – LITHIUM DISCOVERY
Highlights
•
•
•
•
•
•
•
•
•
Significant lithium mineralised claystones (>300ppm) intercepted in all holes that penetrated
the Siebert Formation.
Mineralisation zone thicknesses over 112m in AF2-2 and 67m in AF2-10.
Highest grade mineralisation zones in the project to date with 10.7m at 904ppm Li in AF2-4
and 6.1m at 938ppm Li in AF2-10.
Correlation between widely spaced holes suggests a large aerial extent of mineralisation of
at least 9km2, with over 9km of lateral trends of mineralisation identified.
Mineralisation remains open in all directions and open at depth in the deepest hole, AF2-2.
Drill results support the Alkali Flats basin geological model concept that underpinned the
Phase 2 drilling strategy.
Project transitioning from exploration into appraisal phase.
Initial metallurgical work program has commenced.
Permitting work is underway for Phase 3 drill program including core holes for detailed
metallurgical studies, infill drilling and to test extensions of the known mineralisation.
The Directors of Fulcrum Lithium Ltd (ASX: FUL, Fulcrum or the Company) are pleased to
announce the results of the Phase 2 drilling campaign at the Company’s Alkali Flats project in
Esmeralda County, Nevada, USA (Figure 1).
The drilling program, comprising 10 Reverse Circulation (RC) drill holes averaging 166 metres depth
on a grid spacing generally ranging from 1,500 - 2,500 metres (Figure 2), was designed to test the
Siebert Formation - the regional claystone host for lithium (Li) deposits, which contains in excess of
60 million tonnes of reported lithium carbonate equivalent resources at several deposits in nearby
third-party projects.
The results from Phase 2 drilling at Alkali Flats present the discovery of lithium mineralisation, over
at least a 9 km2 area, displaying significant grade, thickness and lateral extent to justify further infill
and extension drilling to work towards defining a future maiden JORC resource. Mineralisation
remains open in all directions. Furthermore, based on the results from the first 2 phases of drilling at
the Alkali Flats Project, the company has renewed the annual maintenance fees for 512 lode claims
covering an area of 43km2 which focuses on the discovery intersected in Phase 2 drilling campaign.
Scott Keenan, COO, commented:
“The Alkali Flats Phase 2 drilling program has achieved the Company’s first significant milestone
since Fulcrum’s IPO only 10 months ago. The discovery of lithium claystones with significant grades,
thickness and aerial extent gives us confidence to progress the project further with more drilling and
a robust work program, working towards the project’s maiden resource statement. The successful
test of the geological model concept underpinning the Phase 2 drill program further bolsters that
confidence as we move from exploration into appraisal.”
Alkali Flats Project
The Alkali Flats project comprises 512 lode claims, an area of 43 km2, located in Esmerelda
County, Nevada, USA approximately 15km south of the Tonopah Flats and TLC lithium projects
and 10km east of Albermarle’s Silver Peak Lithium mine, the only operating lithium mine in the
USA.
Figure 1. FULCRUM’S ALKALI FLATS PROJECT LOCATION
Phase Two Drill Campaign
The Alkali Flats Phase 2 drilling program follows on from the encouraging maiden results of the
Phase 1 Alkali Flats drilling program that was completed in January 2025, which confirmed the
presence of a claystone-hosted lithium mineralisation system in the Alkali Flats basin. The Phase 2
program was designed to test the Siebert Formation on the western and northern margins of the
Alkali Flats project where Fulcrum’s basin modelling identified the potential for thicker and highergrade lithium mineralised claystones to exist.
The Alkali Flats Phase 2 drilling program intersected Siebert Formation clay zones in 8 of the 10 drill
holes at an average depth of 42m depth, ranging from as shallow as 17m to a maximum alluvial
overburden of 100.6m being intercepted. Drilling shows that the Siebert Formation geology
comprises predominantly of claystones, with an interbedded mixture of volcanic tuffs, and minor
amounts of tuffaceous volcaniclastic sands and gravels.
The thickness of claystones intersected in the Siebert Formation in the 8 holes ranges from 27m to
175m, averaging 82m and can be generally correlated in a lower and an upper zone (Figure 3).
2
Table 1 is a list of the drill holes completed and their coordinates using NAD 83 Zone 11 datum.
Table 1. ALKALI FLATS PHASE 2 DRILL HOLE LOCATIONS AND DEPTH
Drill Hole ID
Easting
Northing
Elevation
(M)
Total Depth
(M)
AF2-1
AF2-2
AF2-3
AF2-4
AF2-5
AF2-6
AF2-7
AF2-8
AF2-9
AF2-10
TOTAL
474544
471969
471757
474844
473357
475964
467451
464599
463801
463778
4184340
4185842
4183531
4182026
4183908
4183727
4188920
4192712
4193633
4185933
1604
1560
1621
1680
1617
1620
1480
1479
1529
1497
243.9
213.4
182.9
213.4
228.7
213.4
93.0
93.0
62.5
122.0
1,666.2
TRUCK MOUNTED RC DRILL RIG ON SITE DURING ALKALI FLATS PHASE 2
PROGRAM
3
Figure 2. ALKALI FLATS PHASE 2 COMPLETED DRILLING PROGRAM
Assays for the 8 holes that intersected the Siebert Formation have been received and confirm that
all 8 holes intersected zones of elevated lithium mineralisation, above 300ppm.
The full table of significant lithium assay results can be found in Table 2. The highest zones
intersected are highlighted as:
•
•
•
•
•
AF2-2:
AF2-5:
AF2-10:
AF2-1:
AF2-4:
70.1m @ 629ppm Li with internal values up to 975ppm Li
53.4m @ 735ppm Li with internal values up to 1067ppm Li
67.1m @ 644ppm Li with internal values up to 1077ppm Li
22.9m @ 611ppm Li with internal values up to 882ppm Li
16.8m@ 801ppm Li with internal values up to 1024ppm Li
4
Table 2. ASSAY RESULTS SHOWING ZONES ABOVE 300PPM Li
HOLE
AF2-1
including
AF2-2
including
AF2-3
AF2-4
including
AF2-5
including
AF2-6
AF2-7
also
also
AF2-7
AF2-8
AF2-9
AF2-10
including
FROM (m)
47.3
56.4
100.6
143.3
134.1
16.8
21.3
53.4
65.5
30.5
24.4
48.8
71.6
86.9
0.0
50.3
53.3
TO (m)
LENGTH (m)
70.1
22.9
62.5
6.1
213.4
112.8
213.4
70.1
147.8
13.7
33.5
16.8
32.0
10.7
106.7
53.4
77.2
12.2
39.6
9.1
45.7
21.3
53.4
4.6
82.3
10.7
93.0
6.1
6.1
6.1
Gravel Cover - No Assays Requested
117.4
67.1
59.4
6.1
Li (ppm)
611
779
554
629
528
801
904
735
881
667
416
502
397
364
402
644
938
Figure 3. CROSS SECTION (A-A’) OF SELECTED ALKALI FLATS PHASE 2 DRILL HOLES
DISPLAYING INTERCEPTED LITHOLOGIES AND LITHIUM CONCENTRATION
(4X VERTICAL EXAGGERATION)
5
Alkali Flats Project Forward Plan
Fulcrum’s forward plan to further delineate and evaluate the Alkali Flats discovery includes a
geophysical program, additional drilling, including core holes to infill and extend the relatively
sparse Phase 2 drill campaign data and an initial metallurgical program. Data acquired from the
forward plan will be required for Fulcrum to deliver a maiden JORC resource, targeted in Q1 2026.
As part of the management of Fulcrum’s wider portfolio, the Alkali Flats claims footprint has been
reshaped to focus on the discovery area and significantly reducing costs. Figure 4 shows the
footprint of the claims that were renewed.
Figure 4. ALKALI FLATS PROJECT RENEWED CLAIMS
6
About Fulcrum Lithium Ltd
Fulcrum Lithium Ltd (ASX: FUL) listed on the ASX on 22 November 2024, to explore the largest
lithium exploration lode claim holding area by a company, of approximately 230 km2, in the heart of
Nevada’s ‘lithium belt’ which hosts Albemarle Corporation’s (NYSE: ALB) Silver Peak lithium mine,
the only lithium producing mine in the USA.
Fulcrum’s Alkali Flats project, is proximate to and on trend with, significant lithium projects at various
stages of exploration and development in a geologic setting with demonstrated success and a mining
friendly jurisdiction.
For further information, please contact:
Scott Keenan
Chief Operating Officer
Fulcrum Lithium Ltd
+61 2 9300 3377
This announcement has been authorised for release by the Company Secretary.
Competent Person’s Statement
The information in this Report that relates to Exploration Results and Exploration Targets is based on, and
fairly represents, information and supporting documentation prepared by Mr Bill R. Fleshman of Global
Geological Services, LLC, a geologist who is a Fellow and Chartered Professional of the Australasian Institute
of Mining and Metallurgy and (FAusIMM CP Geology #107342) and has sufficient experience which is relevant
to the style of mineralisation and type of deposit under consideration and to the activities which are being
undertaken to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Fleshman is an independent
consulting geologist and consents to the inclusion of the Exploration Results and Exploration Targets and
supporting information in the form and context in which it appears.
pjn12726
7
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data – Alkali Flats Phase 2
Criteria
Sampling
techniques
•
•
•
•
Drilling techniques•
Drill sample
recovery
•
•
•
Logging
•
•
•
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
•
JORC Code explanation
Commentary
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of
detailed information.
Drill type (eg core, reverse circulation, open-hole
•
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip
•
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically •
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter, half
or all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
The RC drill cuttings samples were acquired every five feet
(1.524 meters) collected from fluid and cuttings passed through
a cyclone sample collector. Buckets were lined with pre-labelled
bags. Sample bags and chip trays were pre-labelled for field
staff. A Fulcrum geologist collected the samples or trained the
rig sampler in methods. Field personnel monitored the drilled
depth, and drilling was briefly paused at the end of each sample
run to circulate the cuttings to surface. Each sample interval was
logged at the rig by the supervising geologist. Samples were
stored at the drill sites until pickup.
8
Reverse circulation (RC) drilling. The RC drilling was performed
by a 1500MPD track rig with a 5 3/4" (14.61 cm) hammer drill
bit.
Drill cuttings samples were collected every five feet in a cloth
bag inside a 5-gallon bucket from fluid and cuttings passed
through a cyclone sample collector.
Cuttings samples were qualitatively logged and photographed
by drill site geologists.
Drill cutting samples were initially collected wet and
subsequently partially dried out under natural conditions onsite. QA/QC samples (blanks, standards, field duplicates) were
submitted to monitor laboratory performance. Sample size is
appropriate for the planned analyses.
Criteria
Quality of assay •
data and
laboratory tests
•
•
Verification of
sampling and
assaying
•
•
•
•
Location of data •
points
•
•
Data spacing and •
distribution
•
•
Orientation of
•
data in relation to
geological
structure
•
Sample security •
Audits or reviews •
JORC Code explanation
Commentary
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
Samples were analysed by American Assays Laboratories Inc. of
Sparks, Nevada by method 4AB DIGESTION: IO-4AB12 which is
an ICP-MS method employing a 4 acid + boric acid digestion.
Assay quality was monitored using pulp blanks, as well as
certified reference materials (CRMs). CRMs were purchased
from Shea Clark Smith/MEG, Inc. The “MEG” standards are
produced form Esmeralda County claystones. CRMs are
submitted by the site geologist at a rate of 1 in 40 samples. Pulp
blank results indicated no material contamination of samples
from sample preparation or during the analytical process. CRM
results were within 3 standard deviations of certified values. No
systematic bias or other accuracy related issues were identified.
Fulcrum’s QAQC procedure in addition to submitting CRM’s,
Blanks were submitted at a rate of 1 in 40 samples. Duplicate
splits were also submitted at a rate of 1 in 40 samples.
Sample intervals were assigned a unique sample identification
number prior to sample dispatch.
Lithium-mineralised claystone CRMs, duplicates and blanks were
inserted into the sample stream at regular intervals to monitor
lab accuracy and potential contamination during sample prep
and analytical processes.
The verification of significant intersections by either
independent or alternative company personnel.
•
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
•
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased •
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
The measures taken to ensure sample security.
•
The results of any audits or reviews of sampling
techniques and data.
9
Fulcrum geologists used handheld Garmin GPS units to record
sample location sites and as QC. Fulcrum geologists have
recorded the sample sites using NAD 83 Zone 11 datum.
Location of data points is considered to be at acceptable levels
of accuracy and precision.
Drill holes were spaced 1500m-2500m apart. The spacing is
considered adequate for this stage of exploration given the flat
to moderately dipping sedimentary layers.
Drill holes were drilled vertical achieving unbiased sampling of
the underlying structure. The stratigraphy comprises flat,
bedded, mostly sedimentary layers.
RC samples remained in the custody of Fulcrum onsite at the
drill rig until collected by American Assay Laboratory personnel
and transported securely to their laboratory. Samples were
accompanied by submittal sheets. No security issues are
suspected.
No audits or reviews of the data management system have been
carried out.
Section 2 Reporting of Exploration Results
Criteria
Mineral tenement•
and land tenure
status
•
Exploration done •
by other parties
Geology
•
Drill hole
Information
•
o
o
o
o
o
•
JORC Code explanation
Commentary
Type, reference name/number, location and ownership •
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness•
or national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
•
license to operate in the area.
•
The Fulcrum Projects are 100% owned by Fulcrum and are in the
form of 512 unpatented US lode claims located on Federal Land
administered by the US Bureau of Land management (BLM).
Alkali Flats Project – 515 lode claims centred near 469,342 metres
East, 4,187,705 metres North, Universal Transverse Mercator (UTM)
NAD 83, Zone 11 datum in Esmeralda County, Nevada.
Acknowledgment and appraisal of exploration by other •
parties.
Deposit type, geological setting and style of
•
mineralisation.
•
•
•
•
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material •
drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of the
report, the Competent Person should clearly explain why
this is the case.
10
The lode claims require an annual filing of an Intent to Hold
declaration and are subject to annual Maintenance Fee payments to
the BLM and Esmeralda County totalling US$200 per claim. Surface
rights sufficient to explore, develop and mine minerals on the
unpatented lode claims are inherent to the claims provided the
claims are maintained in good standing. The surface rights are
subject to all applicable State and Federal environmental
regulations.
Not applicable as no exploration done by other parties is reported.
The Fulcrum Projects are in areas favourable for claystone hosted
lithium deposits. Project areas were selected based on the presence
of favourable host lithologies within hydrogeological closed basins
that also exhibited high geothermal activity. Fulcrum’s Projects are
geologically similar to other nearby lithium projects in the Tonopah
area with advanced exploration programs. Several of those projects
are currently being investigated at various exploration or
development stages all based primarily on the United States
Geological Survey (USGS) lithium depositional model as presented
by Asher-Bolinder (1991) in which three diagenetic models are
proposed for formation of enriched lithium clays in closed basins:
Alteration of volcanic glass to lithium-rich smectite.
Precipitation from lacustrine waters.
Incorporation of lithium into existing smectites.
A total of 10 holes planned at the Alkali Flats project were
completed for a total of approximately 1666 metres.
All holes were drilled vertically and drill hole coordinates and the
depth of each hole are detailed in the report above.
Criteria
Data aggregation •
methods
•
•
Relationship
•
between
mineralisation •
widths and
intercept lengths •
Diagrams
•
Balanced
reporting
•
Other substantive •
exploration data
Further work
•
•
JORC Code explanation
Commentary
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually material and should be stated.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
These relationships are particularly important in the
•
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
Appropriate maps and sections (with scales) and
•
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration
•
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
Other exploration data, if meaningful and material,
•
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
The nature and scale of planned further work (eg tests •
for lateral extensions or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
Intersections, where quoted are weighted by length.
A 300 ppm Li cut-off was used to quote headline intersections.
Where appropriate, an allowance for 10ft of internal dilution by
lower grade material within contiguous intervals.
Spot grades also quoted for single drill sample intervals of the
highest values within quoted zones.
11
The Siebert Formation is generally flat (<5 degrees) in the drilled
target. All holes are vertical, therefore all reported mineralisation
widths will be very similar to the interception lengths quoted and
the difference will be negligible.
Appropriate diagrams are included in the ASX announcement.
The intersection lengths of zones over the 300 ppm Li cut-off was
published for all holes in the 10 hole drill program.
N/A – no other material exploration data was gathered in this
period.
Further work for the Alkali Flats Project is described in the
announcement.