Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Date: 30 October 2026
ASX: FUL
Shares on issue: 134.1M
Market capitalisation: $9.3
(@ $0.070)
Board of Directors:
Chairman
Norman Seckold
Non-Executive Directors
Anthony McDonald
Tony Sgro
Foster Wilson
Managing Director:
Scott Keenan
Nevada Lithium Projects:
Alkali Flats
Dry Canyon
Contact:
Level 2, 66 Hunter Street
Sydney, NSW, 2000
+61 2 9300 3377
info@fulcrumlithium.com
www.fulcrumlithium.com
QUARTERLY ACTIVITIES REPORT
For the quarter ended 30 September 2026
HIGHLIGHTS
• Large-scale maiden mineral resource estimate (MRE)
for Alkali Flats delivered within a year from discovery.
o 3.57Bt @ 563ppm Li for 10.7Mt total contained
Lithium Carbonate Equivalent (LCE).
• Higher confidence resource classifications include
40% of total in Measured and Indicated
o 2.3Mt LCE Measured Resource and 2.0Mt LCE
Indicated Resource
• Alkali Flats Claims position expanded:
o 41 claims staked to support expansion drilling plans
and bulk sampling for metallurgy.
o Positioned to capture projection of shallowing,
higher-grade core identified in the MRE.
• Metallurgy: Further positive lithium extraction results
and short leach times from a second successful heap
leach scoping test:
o 64% to 79% lithium recovery from calcination roast
and 8-day water column leach tests.
o Significantly lower levels of impurities, low reagent
usage compared with sulfuric acid extractions
• Dry Canyon maiden drill program approved.
Scott Keenan, Managing Director, said:
“This has been a truly transformational quarter for Fulcrum,
with the delivery of a large-scale, high confidence MRE
putting our flagship Alkali Flats project firmly on the map. Our
metallurgical program continues to advance along multiple
extraction pathways with more positive results, and we have
expanded the project to support our growth strategy of
increasing the higher grade core of the resource. Together
with our Dry Canyon project advancing towards a maiden drill
program, Fulcrum’s growth potential is exciting.”
The Directors present the September 2026 Quarterly
Activities Report for Fulcrum Lithium Ltd (Fulcrum or the
Company) and its controlled entities (the Group).
2
OPERATIONS
Nevada Lithium Projects (100% owned)
The Company owns a 100% interest in the Alkali Flats lithium project comprising 698 lode
claims (approximately 58km2) located within the Esmeralda County on Federal public lands
owned and administered by the United States government. The project is situated
approximately 15km south of the Tonopah Flats (American Battery Technology Company)
and TLC (American Lithium Corporation) lithium projects and 10km east of the Silver Peak
(Albemarle Corporation) lithium mine, the only operating lithium mine in the USA (Figure 2).
The Company owns a 100% interest in the Dry Canyon lithium project comprising 536 lode
claims (approximately 45km2) located within the Lander County on Federal public lands
owned and administered by the United States government. The project is situated
approximately 75km south of Battle Mountain, a major mining services centre (Figure 1).
The unpatented lode claims include rights to all locatable subsurface minerals and, under
current law, ownership of an unpatented lode claim is maintained by the owner paying an
annual mining claim maintenance fee of US$200 per claim each year by 1 September.
Figure 1. LOCATION OF FULCRUM’S NEVADA LITHIUM PROJECTS
3
Figure 2. FULCRUM’S ALKALI FLATS PROJECT LOCATION
Alkali Flats Maiden Mineral Resource Estimation
Following the Alkali Flats Phase 3 appraisal drilling program completed in March 2026, the Company
incorporated all drilling, assay and geophysical data into a 3D geological and resource model. Fulcrum
announced the maiden Mineral Resource Estimate (MRE) 4th August, 2026. The company achieved
the project’s major milestone with a large-scale lithium resource estimate delivered within 12 months
from discovery.
The total resource defined by the maiden MRE of 10.7 Mt of contained Lithium Carbonate Equivalent
(LCE), represents a resource of globally significant scale and comparable in size to several advanced
lithium claystone projects in Nevada, including American Battery Technology’s Tonopah Flats project
(18.7 Mt LCE)5
and American Lithium Corp’s TLC project (10.0 Mt LCE)5
and currently is the 7th
largest reported estimate of domestic lithium resources in the United States (Figure 7).
The high degree of geological spatial continuity of the Alkali Flats lithium deposit, assessed from the
44 drill hole penetrations, combined with higher density drill spacing (approximately 600m) in the core
of the deposit, have strongly supported a significant proportion of the resource estimate to have a
higher confidence resource classification (Figure 5). The total measured and indicated resource of 4.3
Mt LCE represents 40% of the total resource.
Accompanying the large resource estimate, opportunities for future drilling to upgrade the resource,
focusing on the shallower, higher-grade domains of the resource which vector to the south-east of the
deposit, provide clear targets for future growth of higher confidence and higher value resources.
Following this project major milestone, work will continue to focus on identifying the lowest cost
processing options through the multi-pathway metallurgical test work program that is already
underway, building off the positive results from the initial metallurgical program which achieved lithium
extractions up to 96%4
.
4
Table 1. Alkali Flats Maiden Mineral Resource Estimate at 400ppm Li cut-off grade
Resource
Category
Mass (Mt) Li (ppm) LCE (ppm)
Contained Li
(Mt)
Contained LCE
(Mt)
Measured 715 604 3,212 0.43 2.30
Indicated 677 564 3,003 0.38 2.03
Measured +
Indicated
1,392 585 3,114 0.81 4.33
Inferred 2,177 549 2,925 1.20 6.37
TOTAL 3,570 563 2,997 2.01 10.70
Lithium Carbonate Equivalent (LCE) = Li x 5.323
Figure 3. Alkali Flats Resource Classification and Drill Hole Locations
5
Figure 4. Alkali Flats 3D Geological Model (Oblique View Looking Southwest)
6
Table 2. Mineral Resource Sensitivity to Lithium Cutoff Grade (Note: Reported Cut-off =
400ppm Li)
Li Cutoff
(ppm)
Classification Tonnes
(Bt)
Li Grade
(ppm)
LCE Grade
(ppm)
Contained
Li (Mt)
Contained LCE
(Mt)
300 Measured 0.973 538 2,862 0.523 2.78
Indicated 1.002 496 2,641 0.497 2.65
Inferred 3.191 487 2,590 1.553 8.27
Total 5.166 498 2,651 2.573 13.70
400 Measured 0.715 604 3,212 0.431 2.30
Indicated 0.677 564 3,003 0.382 2.03
Inferred 2.177 549 2,925 1.196 6.37
Total 3.568 563 2,997 2.009 10.70
500 Measured 0.531 659 3,508 0.350 1.86
Indicated 0.394 650 3,459 0.256 1.36
Inferred 1.406 607 3,233 0.854 4.55
Total 2.331 626 3,334 1.460 7.77
600 Measured 0.359 711 3,786 0.255 1.36
Indicated 0.250 709 3,774 0.177 0.94
Inferred 0.618 677 3,602 0.418 2.23
Total 1.227 693 3,691 0.850 4.53
700 Measured 0.171 778 4,143 0.133 0.71
Indicated 0.116 781 4,158 0.091 0.48
Inferred 0.177 768 4,086 0.136 0.72
Total 0.464 775 4,125 0.360 1.92
Figure 5. Mineral Resource as a Function of Lithium Cut-Off Grade (Reported Cut-off =
400ppm)
7
Fulcrum’s 100% owned Alkali Flats project large-scale lithium resource ranks highly in total resource
size as both a US domestic lithium resource (ranking 7th), as well as a reported MRE by ASX listed
lithium exploration companies (ranking 3rd) (Figure 6).
Figure 6. ASX-Listed Lithium Exploration Company’s Reported Resource Estimates5
in Lithium
Carbonate Equivalent (LCE)
Figure 7. USA Domestic Lithium Project Reported Resource Estimates5
in Lithium Carbonate
Equivalent (LCE)
8
Alkali Flats Project Expansion
Fulcrum has completed the staking of 41 lode claims on the eastern side of the existing claims
boundary (Figure 8) to extend the Company’s prospective and commanding footprint of the Alkali Flats
Basin. The area captured, was targeted using lithium grade and structural trends observed from the
geologic and resource modelling that underpinned the maiden Mineral Resource Estimate (MRE)3
, as
well as additional basin geological knowledge from the company’s extensive exploration of the basin
since listing1,2
(Figure 8). The new number of claims for the project stands at 698, after the company
reshaped the claims to relinquish areas that did not contain resource potential around the margins of
the claims boundary following the MRE work. The number of claims renewed for the 2026/2027 USA
Bureau of Land Management (BLM) lease maintenance year were reduced from 802 to 657, prior to
the staking of these additional 41 claims.
The new claims will support future plans for drilling at the project, as part of the Company’s focus on
the potential to extend the higher confidence, higher grade portion of the resource currently defined
in the Alkali Flats MRE (Figure 9). The higher-grade portion of the resource above the 700ppm Li cut-
off, is estimated at a total combined resource of 1.92Mt LCE at an average grade of 775ppm (Table 2
and Figure 5).
Figure 8. Summary Of Exploration Activities at the Alkali Flats Project, Showing Surface
Sampling Locations, Phase 1–3 Drillholes, CSAMT Survey Lines and Claims Extension Area.
9
Figure 9. Claims Extension in relation to the (A) Alkali Flats Resource Classification and (B)
Plan view estimated lithium grades in the MRE block model.
10
Alkali Flats Metallurgy
Following the success of the first two series of tests in the Company’s initial metallurgical program4,5
,
where excellent lithium extractions from sulfuric acid mini-column heap leach scoping tests achieved
between 93%-96% recoveries, 3 composite samples were selected for further testing by Kappes,
Cassiday and Associates (KCA) in Reno, Nevada, to test heap leaching with water on roasted
samples.
The composite samples were constructed from cuttings samples taken every 1.5m over broad, 30m
zones of varying lithium (Li) grades from 3 reverse circulation (RC) drill holes, AF2-2, AF2-5 and AF2-
10, completed during the Alkali Flats Phase 2 drill program and returned average lithium grades up to
674ppm Li (Table 3).
Roast Calcination and Water Leach Mini-Column Tests
Clay samples were pulverized and pelletized with a 5:1:1 blend ratio of sample, gypsum, limestone
using water. The pellets were roasted at 1,000°C for 1 hour at atmospheric pressure. 1kg of pellets
were placed in a 75mm diameter column under a deionized water drip for 8 days in a closed-circuit,
where the effluent was recycled as feed solution. Measurements of the leachate solution were taken
every 24 hours to track the progress of clay material lithium extraction. After the leach period, the
columns were drained and washed with deionized water. The final leachate, wash solutions and
tailings were assayed for lithium and other elements to determine the percentage of lithium that was
extracted from the clay pellets and the elemental composition.
From the 3 tests on the different zones, a range of 64% to 79% lithium extraction was achieved, with
the majority (up to 68%) extracted within the first 24 hours, when the first sample was assayed. From
the lithium extraction trend over time, after the first 24hrs, when the pregnant leach solution effluent
begins being recycled as feed solution in a closed circuit set up, no further significant extraction
occurs. Significantly, when the final wash with de-ionized water is applied to the columns (the final
sample at hour 192), a 7%-10% final increase in the lithium extraction is recorded, suggesting the
potential for improvements in the process under an open circuit set up, where fresh de-ionized water
is applied daily.
Elemental analysis from the assays of the final leachate solution was performed to measure the
concentrations of other elements reflecting the level of impurities in the leachate solution (Table 4). A
large reduction in impurities compared to the results from the sulfuric acid leach tests were achieved,
with over 99% reductions in Aluminium (Al), Iron (Fe), Magnesium (Mg), Manganese (Mn) and
Titanium (Ti).
Comparatively, the lithium extraction results from these mini-column tests were an improvement from
the roast and water leach previously performed in an agitated beaker, up from 66% to 79%. Although
lower lithium recoveries than the sulfuric acid mini-columns (93-96%), the offsetting benefits of an
acid-free leach with far lower impurities provide significant positive attributes that will be considered
while assessing a variety of potential process flows. The highest lithium extraction values were
increasing towards the east of the resource where the higher grade, shallower zone of the resource
is located. Another positive trend in regard to the reagent usage for the roast calcination and water
leach testing is that the highest lithium extraction levels have been observed from the lowest reagent
ratio (5:1:1), suggesting there is opportunity to optimise this further with lower ratios of gypsum and
limestone which is scheduled for future testing.
Table 3. Location of zones tested
Hole
ZONE 2
AF2-2
ZONE 6
AF2-5
ZONE 8
AF2-10
Depth From (m) 183 53 52
Depth To (m) 213 83 82
Lithium (ppm) 652 674 592
11
Figure 10. 8 Day Mini Column Roast Calcination and Water Leach Results
Table 4. Elemental analysis comparison of Roast Calcination Water Leach to Sulfuric Acid
Leach for Zone 6 (AF2-5).
Roast Calcination and
Water 8 Day Mini Column
Leach
Sulfuric Acid 7 Day Mini
Column Leach
Comparison of Roast Water
Leach to Sulfuric Acid Leach
mg/kg mg/kg %
Al 4 11,003 -99.96%
Ca 1,505 12,820 -88.26%
Fe <1 22,192 -100.00%
K 3,175 10,117 -68.62%
Li 552 654 -15.57%
Mg 18 36,413 -99.95%
Mn <1 713 -99.86%
Na 4,001 948 322.03%
Sr 47 249 -81.11%
Ti <1 475 -99.79%
12
Dry Canyon Project
The Dry Canyon project comprises 536 unpatented lode claims, an area of approximately 45km2
,
located in Lander County, Nevada, USA approximately 75km south of Battle Mountain, a major mining
services hub (Figure 11).
Figure 11. Dry Canyon Project Location
Dry Canyon Maiden Drill Program
The Dry Canyon project comprises 536 unpatented load claims on Federal public land. Basin geology
includes the presence of an abundance of volcanic source rocks with 2 major calderas flanking the
project as well as a closed sedimentary and hydrologic basin, tuffaceous lacustrine sediments and
basin and range extensional tectonic subsidence.
During the quarter, Fulcrum advanced planning and surveying of drill target locations with the drill
program permitting application submitted with the USA Bureau of Land Management (BLM).
Subsequent to the end of the quarter, The Dry Canyon maiden drill program was approved by the
BLM for up to 11 holes, which have been planned after geological surface sampling and geophysical
surveying previously completed by Fulcrum7,8,9
. The drill program will test lithium mineralisation
13
extensions observed in surface samples (up to 1,219ppm Li) both laterally and at depth, supported by
the interpretations of the geophysical data which define potentially shallow and thick claystone targets.
Fulcrum is currently in the process of sourcing a drill rig for this project with a target of Q4 2026,
subject to appropriate drill rig availability.
Figure 12. Dry Canyon Maiden Drill Program Permitted Locations
14
References
1. ASX: FUL 21 February 2025, “Alkali Flats Project Update”
2. ASX: FUL 7 April 2025 “Drill Programs at the Alkali Flats and Fairway Projects”
3. ASX: FUL 4 Aug 2026, “Large Scale Lithium Resource Defined by Alkali Flats Maiden Mineral Resource
Estimate”
4. ASX: FUL 25 Nov 2025, ‘Alkali Flats Initial Metallurgy Results”
5. ASX: FUL 19 May 2026, “Alkali Flats Metallurgy Update”
6. Mineral Resource Estimate References
a. ASX:JLL, Jindalee Lithium, McDermitt PFS, 19 November 2024
b. ASX:LKE, Lake Resources, Kachi Resource Update, 3 June 2025
c. ASX:EMH, European Metals Holdings, Cinovec DFS, 23 December 2025
d. ASX: AZL, Arizona Lithium, Prairie MRE, August 2023
e. ASX:PMT, Patriot Battery Metals, Shaakichiuwaanaan MRE, August 2024
f. ASX:VMS, Venari Minerals, Red Mountain MRE, February 2026
g. ASX:WC8, Wildcat Resources, Tabba Tabba MRE, November 2024
h. ASX:WR1, Winsome Resources, Adina MRE, May 2024
i. ASX:INF, Infinity Lithium, Annual Report 2025
j. ASX:ASN, Anson Resources, Paradox MRE Update, October 2023
k. ASX:PUR, Pursuit Minerals, Rio Sur Grande, 2026MRE Update
l. ASX:GL1, Global Lithium Resources, Manna MRE, June 2024
m. ASX:A11, Atlantic Lithium, Ewoyaa MRE, July 2024
n. ASX:GT1, Green Technology Metals, Root ASX Report, June 2023
o. ASX:ELV, Elvera Lithium, Carolina Lithium DFS, January 2022
p. ASX:GW1, Greenwing Resources, San Jorge MRE, January 2025
q. NYSE:LAC, Lithium Americas, Thacker Pass MRE Update, January 2025
r. TSX:NVLH, Nevada Lithium, Bonnie Claire MRE Update, September 2024
s. NASDAQ:ABAT, American Battery Technology, Tonopah Flats PFS, September 2025
t. TSX:NILI, Surge Battery Metals, Nevada North MRE, June 2026
u. Pheonix Lithium, East, https://www.phoenixlithium.com/project
v. ASX:CC9, Chariot Resources, Horizon MRE, December 2023
w. TSX:LI, American Lithium Corp, TLC MRE Upgrade, February 2025
x. TSX:NEV, Nevada Sunrise, Gemini MRE, March 2024
y. TSX:LCE, Century Lithium, Clayton Valley PFS, January 2026
z. ASX:NLP, Future Battery Metals, NLP MRE, April 2024
aa. TSX:NRM, Noram Lithium Corp, Zeus Technical Report, May 2024
bb. NYSE: SLI, Standard Lithium, Smackover Project DFS, September 2023
cc. Authium, Clayton Ridge 2020 MRE
dd. TSX:SRJ, Spearmint Resources, McGee MRE, June 2022
ee. ASX:INR, Ioneer, Rhyolite Ridge SEC S-K 1300 Technical Report, April 2026
ff. NYSE:ALB, Albermarle Corporation, Kings Mountain/Silve Peak SEC Form 10-K FY2023
gg. AIM:BHL, Bradda Head Lithium, Basin MRE, July 2024
7. ASX: FUL 26 November 2025, ‘High Grade Surface Samples from New Nevada Lithium Project’
8. ASX: FUL 20 April 2026, ‘Geophysical Survey Completed at Dry Canyon’.
9. ASX: FUL 26 May 2026, ‘ Dry Canyon Geophysical Results Lead To Claims Expansion’
15
CORPORATE
DIRECTORS
During the quarter, the Company announced the appointment of Anthony McDonald as Non-
Executive Director, effective 4th September 2026 and the appointment of Scott Keenan as
Managing Director, effective 16th September.
USE OF FUNDS AND EXPENDITURES
The Company provides the following information with respect to its use of funds in its
supplementary prospectus.
Total expenditure during the September quarter was $709,000. Exploration and evaluation
expenditure was $440,000 on claims renewal fees, resource estimate related activities and
sample analysis programs. Administration and corporate expenditures were $269,000 (net of
interest received), including staff costs of $144,000.
No expenditure was incurred during the quarter on mining production and development
activities.
During the September quarter, the aggregate amount of payments to related parties and their
associates totalled $156,000 for payments to Directors or Director related entities for
Directors’ consulting fees and $66,000 for management fees and rent.
Used of Funds
Prospectus
Budget
Actuals 30
September 2026
quarter
Actuals 30 September
2026 Accumulated
from Listing
Expenses of the Offer 807,923 - 640,000
Repayment of Loan Facility 1,000,000 - 1,000,000
Exploration program year 1 2,060,077 - 3,230,000
Exploration program year 2 4,786,000 440,000 2,304,000
Working Capital 800,000 269,000 2,507,000
Total $9,454,000 $709,000 $9,681,000
Total exploration expenditure to date is higher than budgeted exploration expenditure for year
1 due to an acceleration of the Company’s exploration program.
16
TENEMENTS
Project Location
License Number /
Claim Name Holder Interest % Type of Tenement
Alkali Flats Nevada USA A375 to A379, A413 to A417, A451 to A455,
A489 to A500, A534 to A545, A580 to A601,
A636 to A657, A692 to A713, A748 to A768,
A804 to A824, A860 to A865, A894 to A899,
A928 to A933, and A375 to A379.
Last Basin
LLC
100 Exploration
Dry Canyon Nevada USA DC1 to DC 201. DC203, DC 205, DC 207, DC
209. DC211, DC213, DC215, DC 217, DC 226,
DC 227, DC 228, DC 229, DC 256, DC258, DC
356, DC537, DC 3589, DC359, DC379, DC 381,
DC 383, DC 358, DC 387, DC 400, DC 402, DC
404, DC 406, DC 408, DC 427, DC 429, DC431,
DC433, DC 435, DC448, DC450, DC452, DC454,
DC456, DC470, DC472, DC 474, DC476, DC
478, DC 480, DC 487 to DC 495
Flasher
LLC
100 Exploration
Dry Canyon Nevada USA DC 202, DC 204, DC 206, DC 208DC 210, DC
212, DC 214 , DC 216, DC 218 to DC 225, DC
230 to DC 255, DC 257, DC 259 to DC 355, DC
360 to DC378, DCDC 380, DC 382, DC 384, DC
386, DC 388 to DC 299, DC 401, DC 403, DC
405, DC 407, DC 409 to DC426, DC428, DC430,
DC432, DC434, DC436 to DC 447, DC449,
DC451,DC 453, DC455, DC457 to DC 469,
DC471, DC 473, DC 475, DC 477, DC 479, DC
481 to DC486, DC 496 to DC 536
Flasher
LLC
100 Exploration (staked
and in process of filing)
The Company’s projects are held as unpatented lode mining claims located on Federal public lands owned and
administered by the United States government and situated in Nevada, USA. A valid unpatented lode mining
claim is a real property interest in the minerals on the public lands of the United States of America. The locator
of a valid unpatented mining claim has the right to enter the claim and to explore for, develop, produce and sell
the minerals on the claim which are locatable under the Mining Law of 1872, subject to compliance with the
annual mining claim maintenance requirements under the United States Federal Land Policy and Management
Act of 1976 and other applicable federal statutes and regulations.
No Material Changes
The Company confirms it is not aware of any new information or data that materially affects the information
included in this report and that all material assumptions and technical parameters underpinning the Exploration
Results and Mineral Resource estimates, specifically the 4 August 2026 Alkali Flats MRE, prepared by Mrs
Claudia Elena Olvera Prado (MAusIMM) and Mr Bill Fleshman (FAusIMM), in this announcement continue to
apply and have not materially changed.
Competent Person’s Statement
The information in this Report that relates to the Mineral Resource Estimation is based on, and fairly represents,
information and supporting documentation prepared by Mrs Claudia Olvera, a geologist and resource engineer
who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM #3078444) and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activities which are being undertaken to qualify as a Competent Person as defined in the 2012 edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mrs Olvera is
an independent consultant and consents to the inclusion of the Mineral Resource Estimation and supporting
information in the form and context in which it appears.
The information in this Report that relates to Exploration Results is based on, and fairly represents, information
and supporting documentation prepared by Mr Bill R. Fleshman of Global Geological Services, LLC, a
geologist who is a Fellow and Chartered Professional of the Australasian Institute of Mining and Metallurgy
and (FAusIMM CP Geology #107342) and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activities which are being undertaken to
qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of
17
Exploration Results, Mineral Resources and Ore Reserves’. Mr Fleshman is an independent consulting
geologist and consents to the inclusion of the Exploration Results and Exploration Targets and supporting
information in the form and context in which it appears.
This announcement has been authorised for release by the Board of Directors.
For further information please contact:
Scott Keenan
Managing Director
skeenan@fulcrumlithium.com
+61 (0)438 487 034
pjn13037
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
FULCRUM LITHIUM LTD
ABN Quarter ended (“current quarter”)
23 665 528 307 30 September 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(440) (440)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (144) (144)
(e) administration and corporate costs (146) (146)
1.3 Dividends received (see note 3) - -
1.4 Interest received 21 21
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other revenue - -
1.8 Other - -
1.9 Net cash from / (used in) operating
activities (709) (709)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements – Bond deposit - -
(c) property, plant and equipment - -
(d) exploration & evaluation - -
(e) investments - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
(f) other non-current assets (Bond
Deposit)
- -
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other - -
2.6 Net cash from / (used in) investing
activities - -
3. Cash flows from financing activities
- -
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities - -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities - -
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings (lease payments) - -
3.6 Repayment of borrowings (loan facility) - -
3.7 Transaction costs related to loans and
borrowings - -
3.8 Dividends paid - -
3.9 Other - -
3.10 Net cash from / (used in) financing
activities - -
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period 1,584 1,584
4.2 Net cash from / (used in) operating
activities (item 1.9 above) (709) (709)
4.3 Net cash from / (used in) investing activities
(item 2.6 above) - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
4.4 Net cash from / (used in) financing activities
(item 3.10 above) - -
4.5 Effect of movement in exchange rates on
cash held - -
4.6 Cash and cash equivalents at end of
period 875 875
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 71 179
5.2 Call deposits 804 1,405
5.3 Bank overdrafts - -
5.4 Other (Term Deposit) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above) 875 1,584
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1 156
6.2 Aggregate amount of payments to related parties and their
associates included in item 2 66
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
6.1 Director fees and superannuation.
6.2 Management fees.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility amount
at quarter end
$’000
Amount drawn at
quarter end
$’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (709)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d)) -
8.3 Total relevant outgoings (item 8.1 + item 8.2) (709)
8.4 Cash and cash equivalents at quarter end (item 4.6) 875
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 875
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3) 1.23
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flow