Annual Report, Notice of AGM and Proxy Form
Released
Released
Announcement PDF
(134 pages by email)
27 October 2026
The Manager Companies
ASX Limited
20 Bridge Street
SYDNEY NSW 2000
Dear Sir / Madam
ANNUAL REPORT
AND NOTICE OF AGM
I attach the Company's Annual Report for the year ended 30 June 2026 and a copy of the Company's
Notice of Annual General Meeting to be held on 27 November 2026.
To transact any other business that may be brought forward in accordance with the Company's
Constitution.
By order of the Board
Marcelo Mora
Director
pjn13039
Fulcrum Lithium Ltd
and its controlled entities
ABN: 23 665 528 307
ANNUAL
REPORT 2026
Contents
Review of Operations 01
Corporate Governance Statement 33
Directors’ Report 34
Lead Auditor’s Independence Declaration 50
Consolidated Statement of Profit or Loss and Other Comprehensive Income 51
Consolidated Statement of Financial Position 52
Consolidated Statement of Changes in Equity 53
Consolidated Statement of Cash Flows 54
Notes to the Consolidated Financial Statements 55
Consolidated Entity Disclosure Statement 78
Directors’ Declaration 79
Independent Auditor’s Report 80
Additional ASX Information 86
Corporate Directory 90
2026 Annual Report Fulcrum Lithium Ltd 1
Review of Operations
The Directors present their report together with the consolidated financial
statements of the Group, comprising Fulcrum Lithium Ltd (Fulcrum or the Company)
and its controlled entities, for the year ended 30 June 2026.
Review of Operations
Fulcrum Lithium Ltd listed on the ASX on 22 November 2024, to explore a large lithium exploration lode claim
holding area, in the heart of Nevada’s ‘lithium belt’ which hosts Albemarle Corporation’s (NYSE: ALB) Silver
Peak lithium mine, the only lithium producing mine in the USA.
The Company’s two lithium projects in Nevada, USA are:
• the Alkali Flats lithium project comprising 802 lode claims (approximately 66 km2
);
• the Dry Canyon lithium project comprising 536 lode claims (approximately 45 km2
); and
The projects are targeting the Miocene aged lacustrine claystones, which host in excess of 100 million tonnes
of reported lithium carbonate equivalent resources at several deposits in nearby third-party projects in
Nevada.
2 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Figure 1. FULCRUM’S PROJECT LOCATIONS
During the year ended 30 June 2026, the Company completed 1 drilling program (Phase 3) at the Alkali Flats
project and 2 geophysical surveys. Metallurgical studies and geological and resource modelling were also
completed leading to the maiden mineral resource estimate (MRE) which was subsequently announced on
4th August 2026.
Alkali Flats Project
The Company owns a 100% interest in the Alkali Flats lithium project comprising 802 lode claims
(approximately 66km2
) located within the Esmeralda County on Federal public lands owned and administered
by the United States government. The project is situated approximately 15km south of the Tonopah Flats
(American Battery Technology Company) and TLC (American Lithium Corporation) lithium projects and 10km
east of the Silver Peak (Albemarle Corporation) lithium mine, the only operating lithium mine in the USA
(Figure 2).
2026 Annual Report Fulcrum Lithium Ltd 3
Review of Operations
Figure 2. FULCRUM’S ALKALI FLATS PROJECT LOCATION
Alkali Flats Geophysical Survey
As part of the appraisal program following the Alkali Flats Phase 2 drilling discovery of lithium mineralisation,
Fulcrum completed a 25km Controlled-Source Audio-Frequency Magnetotelluric (CSAMT) geophysical
survey which has provided a high-quality final dataset. The CSAMT survey was completed to map potential
extensions of lithium claystones intersected in the Phase 2 drilling and to optimise the drill hole locations in
the upcoming Phase 3 drilling campaign.
CSAMT surveys are a commonly used geophysical technique for identifying the presence of highly electrically
conductive rocks, such as claystones, by transmitting harmless electrical signals into the ground and
recording the response at receiver stations, with high resolution at shallow depths. The 2D survey lines were
designed in an EW parallel grid to tie into existing Phase 2 drill holes for data and geological calibration and to
map the basin architecture to guide the 3D geological and resource models.
The 25km CSAMT geophysical survey was conducted between 1 October 2025 to 17 October 2025 with high
quality data reported during both field operations and final processing audits.
The 2D inversion sections (Figure 4) were interpreted by the Fulcrum geological team. High confidence
extensions of lithium mineralised claystones of the Seibert Formation were interpreted along with overburden
gravel thickness, basement terranes as well as structural trends and extensional faults. At AF2-2 drill hole
location (Figure 5), where mineralisation remains open at depth and currently 112m thick, the CSAMT data is
detecting a potentially very thick lithium claystone interval over 300m thick and importantly, structural dips
and upthrown fault blocks are interpreted to bring thick mineralised clays much closer to the surface, less
than 25m. The mapped extensions and structural information were crucial for the planning of the Phase 3
drilling program and as input into the geological and resource models.
4 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Figure 3. ALKALI FLATS CSAMT SURVEY LOCATION
Review of Operations
Figure 4. ALKALI FLATS CSAMT 2D INVERSION RESULTS
Review of Operations
2026 Annual Report Fulcrum Lithium Ltd 5
6 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Figure 5. CSAMT 2D INVERSION DATA WITH BASIC INTERPRETATION (LINES L100 AND L300)
Figure 6. CSAMT SURVEY RECEIVER DEPLOYMENT AT THE ALKALI FLATS PROJECT
2026 Annual Report Fulcrum Lithium Ltd 7
Review of Operations
Alkali Flats Phase 3 Drilling Program
The Alkali Flats Phase 3 drill program commenced on 27th January 2026 and was completed by 29th March
2026. Completion of the Phase 3 drill program marked an important milestone in the appraisal of the Alkali
Flats lithium project following the successful significant discovery following the success of Phase 2 drilling1
,
geophysical surveying2
and initial metallurgy work4
completed to date.
The Phase 3 drilling program comprises 39 holes (Figure 7) totalling 5,787m, representing a 5-fold increase
in the amount of drilling over the deposit and reducing the hole spacing from a currently wide spacing
averaging 2,000m down to 600m in the core of the project which significantly increases the data density,
reduces uncertainty and increases confidence in modelling and resource estimations. The Alkali Flats Phase
3 drill program provided the increased drill hole density and crucial information to enable Fulcrum’s maiden
Mineral Resource Estimate following integration of all the geological, geophysical and engineering data.
Table 1 is a list of all Phase 3 drill holes completed and their coordinates using NAD 83 Zone 11 datum.
Table 1. ALKALI FLATS PHASE 3 DRILL HOLE LOCATIONS AND DEPTH
Drill Hole ID Easting Northing Elevation (M) Total Depth (M)
AF3-E1 471980 4185032 1582 102
AF3-E2 474332 4183094 1655 102
AF3-E3 473872 4183470 1639 142
AF3-E4 473833 4182753 1656 87
AF3-E5 472953 4184241 1576 145
AF3-E6 473207 4182589 1673 47
AF3-E7 473307 4183270 1668 78
AF3-E8 472812 4183694 1634 47
AF3-E9 472476 4184628 1601 169
AF3-E10 471210 4184757 1591 125
AF3-E11 471624 4185733 1559 209
AF3-E12 472252 4185397 1571 261
AF3-E13 472696 4185158 1591 261
AF3-E14 473333 4184818 1603 197
AF3-E15 473529 4184337 1610 288
AF3-E16 473911 4184109 1628 136
AF3-E17 473915 4184553 1609 264
AF3-E18 474333 4183808 1633 183
AF3-E19 470750 4188796 1493 122
AF3-E20 470346 4187827 1502 148
AF3-E21 471253 4187052 1520 122
AF3-E22 471604 4187732 1510 148
AF3-E23 471657 4186273 1575 221
8 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Drill Hole ID Easting Northing Elevation (M) Total Depth (M)
AF3-E24 471051 4186074 1739 122
AF3-E25 473535 4185404 1693 203
AF3-E26 473380 4186107 1741 244
AF3-W1 467736 4187642 1505 38
AF3-W2 466323 4187007 1476 73
AF3-W3 464844 4186776 1482 133
AF3-W4 463983 4187100 1472 111
AF3-W5 465813 4186047 1489 75
AF3-W6 464747 4185604 1479 139
AF3-W7 463536 4184808 1473 123
AF3-W8 464120 4183742 1475 183
AF3-C01 474329 4183099 1645 94
AF3-C02 472947 4184243 1603 140
AF3-C03 471629 4185732 1534 217
AF3-C04 464746 4185603 1499 152
AF3-C05 463982 4187106 1479 136
TOTAL 5,787
2026 Annual Report Fulcrum Lithium Ltd 9
Review of Operations
Figure 7. ALKALI FLATS PHASE 3 DRILL PROGRAM
10 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
The program was designed to infill drill the Phase 2 discovery as well as extend the discovery in open
directions. Of the 39 holes, 34 intersected lithium mineralization greater than 300 ppm Li. The full table of
significant lithium assay results can be found in Table 2. The thickest zones intersected are highlighted as:
• AF3-E13: 147.9m @ 507ppm Li with internal values up to 1,145ppm Li
• AF3-E14: 112.8m @ 546ppm Li with internal values up to 903ppm Li
• AF3-E26: 103.7m @ 541ppm Li with internal values up to 965ppm Li
• AF3-E15: 94.5m @ 563ppm Li with internal values up to 1,070ppm Li
• AF3-W3: 91.5m @ 569ppm Li with internal values up to 1021ppm Li
• AF3-E9: 86.9m @ 500ppm Li with internal values up to 933ppm Li
• AF3-E5: 86.9m @ 587ppm Li with internal values up to 953ppm Li
• AF3-E25: 80.8m @ 572ppm Li with internal values up to 1,063ppm Li
Figure 8. RC DRILL RIG ONSITE AT ALKALI FLATS PHASE 3 PROGRAM
2026 Annual Report Fulcrum Lithium Ltd 11
Review of Operations
Figure 9. CORE OF SEIBERT FORMATION CLAYSTONE (AF3-CO2, 330ft - 440ft)
12 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Table 2. PHASE 3 ASSAY RESULTS SHOWING ZONES ABOVE 300PPM Li
Drill Hole ID From (m) To (m) Interval(m) Li (ppm)
AF3-E1 35.1 79.3 44.2 530
AF3-E2 38.1 86.9 48.8 722
including 41.2 56.4 15.2 834
AF3-E3 82.3 128.0 45.7 713
including 93.0 102.1 9.1 898
AF3-E4 39.6 73.2 33.5 668
including 44.2 50.3 6.1 801
AF3-E5 44.2 131.1 86.9 587
including 80.8 93.0 12.2 802
AF3-E6 7.6 32.0 24.4 577
also 39.6 42.7 3.0 482
AF3-E7 44.2 61.0 16.8 546
AF3-E8 29.0 30.5 1.5 430
also 41.2 42.7 1.5 764
AF3-E9 64.0 150.9 86.9 500
including 114.3 117.4 3.0 845
AF3-E10 No mineralization >300 ppm Li
AF3-E11 70.1 163.1 93.0 433
also 170.7 172.3 1.5 419
AF3-W1 No mineralization >300 ppm Li
AF3-W3 25.9 117.4 91.5 569
including 38.1 41.2 3.0 833
AF3-W4 35.1 109.8 74.7 511
including 42.7 47.3 4.6 816
AF3-W5 7.6 35.1 27.4 520
also 56.4 59.5 3.0 521
AF3-W6 39.6 111.3 71.6 520
also 115.9 122.0 6.1 599
AF3-W7 No mineralization >300 ppm Li
AF3-E12 122.0 138.7 16.7 378
also 143.3 257.6 114.3 461
AF3-E13 112.8 260.7 147.9 507
including 198.2 221.0 22.8 838
AF3-E14 64.0 176.8 112.8 546
including 109.8 129.6 19.8 809
AF3-E15 59.5 154.0 94.5 563
2026 Annual Report Fulcrum Lithium Ltd 13
Review of Operations
Drill Hole ID From (m) To (m) Interval(m) Li (ppm)
including 97.6 111.3 13.7 806
AF3-E16 35.1 106.7 71.6 602
including 54.9 68.6 13.7 802
AF3-E17 57.9 117.4 59.5 696
including 71.6 96.0 24.4 841
AF3-E18 99.1 173.8 74.7 695
including 115.9 140.2 24.3 862
AF3-E19 67.1 93.0 25.9 491
also 99.1 108.2 9.1 420
also 125.0 129.6 4.6 664
AF3-E20 13.7 19.8 6.1 397
AF3-E21 57.9 67.1 9.2 547
also 73.2 105.2 32.0 482
AF3-E22 No mineralization >300 ppm Li
AF3-E23 108.2 150.9 42.7 387
also 157.0 167.7 10.7 413
also 172.3 184.5 12.2 433
also 210.4 221.0 10.6 312
AF3-E24 No mineralization >300 ppm Li
AF3-E25 76.2 157.0 80.8 572
including 126.5 146.3 19.8 903
also 164.6 190.5 25.9 589
AF3-E26 96.0 199.7 103.7 541
including 166.2 190.5 24.3 829
also 207.3 231.7 24.4 437
AF3-C01 (Twin of AF3-E2) 39.0 85.1 46.1 712
including 42.9 54.8 11.9 827
AF3-C02 (Twin of AF3-E5) 46.0 134.7 88.7 563
including 76.2 96.3 20.1 805
AF3-C03 (Twin of AF3-E11) 71.8 94.0 22.2 386
also 97.6 156.3 58.7 432
AF3-C04 (Twin of AF3-W6) 33.2 119.2 86.0 461
AF3-C05 (Twin of AF3-W4) 25.6 108.7 83.1 464
AF3-W8 137.2 138.7 1.5 376
14 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Figure 10. ALKALI FLATS PHASE 3 DRILL PROGRAM ASSAY RESULTS
2026 Annual Report Fulcrum Lithium Ltd 15
Review of Operations
Figure 11. ALKALI FLATS SCHEMATIC CROSS SECTION A-A’
The Phase 3 drilling data confirmed the large scale potential identified in Phase 2 discovery and geophysical
survey data, and exceeded expectations in several respects. The thickness of the mineralised zone in the
core of the discovery, the large lateral extent proven by step out holes and the highly correlatable and
continuous nature of the mineralised zones over more than 8km in strike, with the deposit remaining open
in 3 of the 4 directions, demonstrated the large-scale potential of the deposit. Phase 3 data was critical for
incorporating into the geological model to demonstrate the full scale and high confidence estimation of the
deposit with the maiden resource estimate.
Alkali Flats Metallurgy Program
Following the Alkali Flats Phase 2 RC drilling program lithium claystone discovery, zones of up to 30 metres
were selected across 5 drill holes representing higher grade, lower grade zones and 2 control zones. Samples
across each zone were composited to represent the average properties over the broader 30m zone. Samples
were run through the analytical process by Kappes, Cassiday and Associates (KCA) in Reno, Nevada, in a
workflow that included a head analysis of mineralogy and lithium grade, particle size screening, sulfuric acid
leaching tests with varying acid strengths and temperature.
Results from the head screening analysis demonstrate that in the higher-grade zones, 97%-100% of the
lithium was contained in the <0.045mm particle size fraction and up to 42% of carbonate (calcite) was
removed in the >0.045mm particle size fraction.
Table 3. HEAD GRADE ANALYSIS LITHIUM GRADE
ZONE 1 ZONE 2 ZONE 3 ZONE 4
ZONE 5
(CONTROL) ZONE 6
ZONE 7
(CONTROL) ZONE 8
Hole AF2-2 AF2-2 AF2-3 AF2-4 AF2-4 AF2-5 AF2-5 AF2-10
Depth From (m) 100 183 134 16 82 53 133 52
Depth To (m) 130 213 147 34 112 83 136 82
Lithium (mg/kg) 414 652 472 636 156 674 142 592
16 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Figure 12. 4 HOUR SULFURIC ACID LEACH RESULTS WITH VARYING ACID STRENGTHS
Figure 13. 4 HOUR SULFURIC ACID LEACH RESULTS WITH VARYING TEMPERATURES
2026 Annual Report Fulcrum Lithium Ltd 17
Review of Operations
Mineralogical analysis using Quantitative X-Ray Diffraction (QXRD) was completed to understand the
mineral composition of the lithium claystones as well as the clay-types present. Results from this analysis
describe the claystones as a mixture of illite and smectite clays containing calcite, K-feldspar and plagioclase
fractions. This claystone composition is similar to other lithium clay deposits of the Siebert Formation in the
local Esmeralda County area.
Following the success of the first series of tests in the Company’s initial metallurgical further tests were
conducted focused on beneficiation and leaching techniques. The further metallurgical test work conducted
by KCA included hydrocyclone separation, alcohol screening and roast calcination followed by water leaching.
These tests were designed to gain a further understanding of the leachability of the Alkali Flats lithium
bearing claystones, to compare the performance of different clay zones within the project, to analogue other
nearby claystone projects and to guide and accelerate a more detailed metallurgical program from drill core
from the current Phase 3 drilling program.
Alcohol Screening
The clay samples were wet screened using isopropyl alcohol with a 0.020mm size screen to separate the
solids by particle size. The undersized and oversized fractions were dried, weighed, and assayed to determine
the degree of separation of lithium bound in clay particles, carbonates, which are a major acid consumer, and
the reduction in mass.
Hydrocyclone Separation
A laboratory scale hydrocyclone (25mm diameter) was used to separate the 5% solid clay slurry by density.
The underflow and overflow fractions were dried, weighed and assayed to determine the degree of separation
of lithium bound in clay particles, carbonates which are a major acid consumer and the reduction in mass.
Roast Calcination and Water Leach
Clay samples were pulverized and pelletized with varying blend ratios of gypsum, limestone using water.
The pellets were roasted at 1,000°C for 1 hour at atmospheric pressure. The pellets were water leached with
agitation for 1 hour. The leachate and the tailings were assayed to determine the percentage of lithium that
was extracted from the clay pellets.
Mini-Column Tests
Clay samples were pelletized and sulfuric acid cured. 1kg of pellets was placed in a 75mm diameter column
under a diluted sulfuric acid drip for 7 days. The leachate and clay tailings were assayed to determine the
percentage of lithium that was extracted from the clay pellets. Measurements of the leachate solution were
taken every 24 hours to track the progress of clay material lithium extraction.
18 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Table 4. BENEFICIATION AND LEACHING TESTS RESULTS SUMMARY
Alcohol Screening
AF2-2 (Zone 2) AF2-5 (Zone 6) AF2-10 (Zone 8)
Mass Reduction Not Run 12% 15%
Carbonate Reduction Not Run 30% 10%
Grade Increase Not Run 12% 11%
Hydrocyclone Separation
AF2-2 (Zone 2) AF2-5 (Zone 6) AF2-10 (Zone 8)
Mass Reduction 26% 29% 41%
Carbonate Reduction 53% 54% 41%
Grade Increase 15% 13% 27%
Roast Calcination and Water Leach
AF2-2 (Zone 2) AF2-5 (Zone 6) AF2-10 (Zone 8)
Lithium Extraction Not Run Not Run
Roast Blend A Roast Blend B Roast Blend C
66% 59% and 57% 30% and 12%
7-Day Mini Column Leach
AF2-2 (Zone 2) AF2-5 (Zone 6) AF2-10 (Zone 8)
Lithium Extraction 95% 96% 93%
Figure 14. 7 DAY MINI-COLUMN LEACH RESULTS
2026 Annual Report Fulcrum Lithium Ltd 19
Review of Operations
Alkali Flats Maiden Mineral Resource Estimation
Following the Alkali Flats Phase 3 appraisal drilling program completed in March 2026, the Company
incorporated all drilling, assay and geophysical data into a 3D geological and resource model. Fulcrum
announced the maiden Mineral Resource Estimate (MRE) subsequent to the reporting period, on 4th August,
2026. The company achieved the project’s major milestone with a large-scale lithium resource estimate
delivered within 12 months from discovery.
The total resource defined by the maiden MRE of 10.7 Mt of contained Lithium Carbonate Equivalent (LCE),
represents a resource of globally significant scale and comparable in size to several advanced lithium
claystone projects in Nevada, including American Battery Technology’s Tonopah Flats project (18.7 Mt LCE)5
and American Lithium Corp’s TLC project (10.0 Mt LCE)5
and currently is the 7th largest reported estimate of
domestic lithium resources in the United States (Figure 19).
The high degree of geological spatial continuity of the Alkali Flats lithium deposit, assessed from the 44
drill hole penetrations, combined with higher density drill spacing (approximately 600m) in the core of
the deposit, have strongly supported a significant proportion of the resource estimate to have a higher
confidence resource classification (Figure 15). The total measured and indicated resource of 4.3 Mt LCE
represents 40% of the total resource.
Accompanying the large resource estimate, opportunities for future drilling to upgrade the resource, focusing
on the shallower, higher-grade domains of the resource which vector to the south-east of the deposit, provide
clear targets for future growth of higher confidence and higher value resources.
Following this project major milestone, work will continue to focus on identifying the lowest cost processing
options through the multi-pathway metallurgical test work program that is already underway, building off the
positive results from the initial metallurgical program which achieved lithium extractions up to 96%4
.
Table 5. Alkali Flats Maiden Mineral Resource Estimate at 400ppm Li cut-off grade
Resource Category Mass (Mt) Li (ppm) LCE (ppm) Contained Li (Mt) Contained LCE (Mt)
Measured 715 604 3,212 0.43 2.30
Indicated 677 564 3,003 0.38 2.03
Measured + Indicated 1,392 585 3,114 0.81 4.33
Inferred 2,177 549 2,925 1.20 6.37
TOTAL 3,570 563 2,997 2.01 10.70
Lithium Carbonate Equivalent (LCE) = Li x 5.323
20 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Figure 15. Alkali Flats Resource Classification and Drill Hole Locations
Review of Operations
Figure 16. Alkali Flats 3D Geological Model (Oblique View Looking Southwest)
Review of Operations
2026 Annual Report Fulcrum Lithium Ltd 21
Review of Operations
Table 6. Mineral Resource Sensitivity to Lithium Cutoff Grade (Note: Reported Cut-off = 400ppm Li)
Li Cutoff
(ppm) Classification
Tonnes
(Bt)
Li Grade
(ppm)
LCE Grade
(ppm)
Contained Li
(Mt)
Contained LCE
(Mt)
300
Measured 0.973 538 2,862 0.523 2.78
Indicated 1.002 496 2,641 0.497 2.65
Inferred 3.191 487 2,590 1.553 8.27
Total 5.166 498 2,651 2.573 13.70
400
Measured 0.715 604 3,212 0.431 2.30
Indicated 0.677 564 3,003 0.382 2.03
Inferred 2.177 549 2,925 1.196 6.37
Total 3.568 563 2,997 2.009 10.70
500
Measured 0.531 659 3,508 0.350 1.86
Indicated 0.394 650 3,459 0.256 1.36
Inferred 1.406 607 3,233 0.854 4.55
Total 2.331 626 3,334 1.460 7.77
600
Measured 0.359 711 3,786 0.255 1.36
Indicated 0.250 709 3,774 0.177 0.94
Inferred 0.618 677 3,602 0.418 2.23
Total 1.227 693 3,691 0.850 4.53
700
Measured 0.171 778 4,143 0.133 0.71
Indicated 0.116 781 4,158 0.091 0.48
Inferred 0.177 768 4,086 0.136 0.72
Total 0.464 775 4,125 0.360 1.92
22 Fulcrum Lithium Ltd 2026 Annual Report
2026 Annual Report Fulcrum Lithium Ltd 23
Review of Operations
Figure 17. Mineral Resource as a Function of Lithium Cut-Off Grade (Reported Cut-off = 400ppm)
Fulcrum’s 100% owned Alkali Flats project large-scale lithium resource ranks highly in total resource size
as both a US domestic lithium resource (ranking 7th), as well as a reported MRE by ASX listed lithium
exploration companies (ranking 3rd) (Figure 18).
Figure 18. ASX-Listed Lithium Exploration Company’s Reported Resource Estimates5
in Lithium Carbonate
Equivalent (LCE)
Review of Operations
24 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Figure 19. USA Domestic Lithium Project Reported Resource Estimates5
in Lithium Carbonate Equivalent (LCE)
Alkali Flats Claims
During the reporting period, Fulcrum has reshaped the Alkali Flats Project claims position to reflect
drilling results and resource estimation work completed. In August 2025, 512 claims were renewed for the
2025/2026 BLM lease maintenance year. In October 2025, an additional 281 claims were staked and filed to
increase the number of claims to 802. At the end of the reporting period, Alkali Flats consisted of 802 claims.
After the reporting period, based on the Phase 3 drilling results and resource estimation work, the company
has reshaped the claims of the Alkali Flats project to relinquish areas that did not contain resource potential
around the margins of the claims boundary. After the reporting period, 657 claims were renewed for the
2026/2027 BLM lease maintenance year providing a significant saving in annual claim maintenance costs.
2026 Annual Report Fulcrum Lithium Ltd 25
Review of Operations
Dry Canyon Project
In November 2025, Fulcrum filed 201 unpatented load claims in Lander County, Nevada, on Federal public
land. The claims were staked by the Company and, within 90 days of staking, filed with the USA Bureau of
Land Management (BLM). The load claims (Figure 20) give Fulcrum the right to access and conduct mineral
exploration and mining under the guidelines and rules set forth in General Mining Act of 1872, and include
rights to all locatable surface minerals.
Basin geology includes the presence of an abundance of volcanic source rocks with 2 major calderas flanking
the project as well as a closed sedimentary and hydrologic basin, tuffaceous lacustrine sediments and basin
and range extensional tectonic subsidence.
Figure 20. DRY CANYON PROJECT LOCATION
26 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Dry Canyon Exploration
Following a state-wide review of lithium claystone opportunities, Dry Canyon emerged as the highest potential
target based on the geological features of basins that support high grade lithium potential. To support
the desktop review, a surface sampling program with a total of 62 samples were collected for assaying in
Fulcrum’s initial surface sampling program completed in November 2025, with 31 samples returning assay
results above 300ppm Li and 6 samples above 1,000ppm Li, confirming this potential (Figure 21).
In April 2026 a 13km CSAMT survey was completed, acquiring high quality 2D data providing key structural
trends and potential lithology identification (Figure 23). CSAMT surveys are a commonly used geophysical
technique for identifying the presence of highly electrically conductive rocks, such as claystones, by
transmitting harmless electrical signals into the ground and recording the response at receiver stations. Data
quality was assessed during the QC and processing of the data and was determined to be a high quality
dataset.
The 2D inversion sections were interpreted by the Fulcrum geological team. Extensions of the claystone
unit containing the high-grade (up to 1,219ppm Li) lithium mineralised claystones sampled at surface are
interpreted to extend beyond 500m at the thickest parts and more than 200m across the whole project area
(Figure 25). Overburden thickness, basement depth as well as structural trends and extensional faults were
able to be interpreted, with generally thin (<25m) overburden across the majority of the project area. These
geophysical interpretations form the basis of the drilling targets being planned in the upcoming maiden drill
program which will test and calibrate the geophysical responses and provide the first drilling of these targets
in the basin.
The interpretation of this geophysical data provides the first look at the structure of the basin and potential
lithologies that can indicate the potential for deposit scale, trend vectors and optimal drilling targets.
Subsequent to the encouraging results from the CSAMT survey, Fulcrum staked an additional 335
unpatented lode claims to expand the project to 536 lode claims (approximately 45km2
), securing the high
potential basin acreage on Federal public land (Figure 22).
2026 Annual Report Fulcrum Lithium Ltd 27
Review of Operations
Figure 21. DRY CANYON CSAMT SURVEY WITH SURFACE SAMPLE LITHIUM ASSAYS
28 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Figure 22. DRY CANYON CLAIMS EXTENSION LOCATION
2026 Annual Report Fulcrum Lithium Ltd 29
Review of Operations
Figure 23. DRY CANYON CSAMT SURVEY 2D INVERSION RESULTS
30 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
Figure 24. CSAMT 2D INVERSION DATA WITH BASIC INTERPRETATION
Dry Canyon Claims
After the reporting period, In September 2026, 253 claims had been renewed for the 2026/2027 BLM lease
maintenance year and an additional 283 claims were staked and in the process of being filed.
2026 Annual Report Fulcrum Lithium Ltd 31
Review of Operations
References
1. ASX: FUL 24 September 2025, ‘Alkali Flats Project Update – Lithium Discovery’.
2. ASX: FUL 17 November 2025, ‘Geophysical Survey Results Expand Alkali Flats Lithium Claystone Target’
3. ASX: FUL 25 May 2026, “Thickest and Highest Grade Lithium at Alkali Flats”
4. ASX: FUL 19 May 2026, “Alkali Flats Metallurgy Update”
5. Mineral Resource Estimate References
a. ASX:JLL, Jindalee Lithium, McDermitt PFS, 19 November 2024
b. ASX:LKE, Lake Resources, Kachi Resource Update, 3 June 2025
c. ASX:EMH, European Metals Holdings, Cinovec DFS, 23 December 2025
d. ASX: AZL, Arizona Lithium, Prairie MRE, August 2023
e. ASX:PMT, Patriot Battery Metals, Shaakichiuwaanaan MRE, August 2024
f. ASX:VMS, Venari Minerals, Red Mountain MRE, February 2026
g. ASX:WC8, Wildcat Resources, Tabba Tabba MRE, November 2024
h. ASX:WR1, Winsome Resources, Adina MRE, May 2024
i. ASX:INF, Infinity Lithium, Annual Report 2025
j. ASX:ASN, Anson Resources, Paradox MRE Update, October 2023
k. ASX:PUR, Pursuit Minerals, Rio Sur Grande, 2026MRE Update
l. ASX:GL1, Global Lithium Resources, Manna MRE, June 2024
m. ASX:A11, Atlantic Lithium, Ewoyaa MRE, July 2024
n. ASX:GT1, Green Technology Metals, Root ASX Report, June 2023
o. ASX:ELV, Elvera Lithium, Carolina Lithium DFS, January 2022
p. ASX:GW1, Greenwing Resources, San Jorge MRE, January 2025
q. NYSE:LAC, Lithium Americas, Thacker Pass MRE Update, January 2025
r. TSX:NVLH, Nevada Lithium, Bonnie Claire MRE Update, September 2024
s. NASDAQ:ABAT, American Battery Technology, Tonopah Flats PFS, September 2025
t. TSX:NILI, Surge Battery Metals, Nevada North MRE, June 2026
u. Pheonix Lithium, East, https://www.phoenixlithium.com/project
v. ASX:CC9, Chariot Resources, Horizon MRE, December 2023
w. TSX:LI, American Lithium Corp, TLC MRE Upgrade, February 2025
x. TSX:NEV, Nevada Sunrise, Gemini MRE, March 2024
y. TSX:LCE, Century Lithium, Clayton Valley PFS, January 2026
z. ASX:NLP, Future Battery Metals, NLP MRE, April 2024
aa. TSX:NRM, Noram Lithium Corp, Zeus Technical Report, May 2024
bb. NYSE: SLI, Standard Lithium, Smackover Project DFS, September 2023
cc. Authium, Clayton Ridge 2020 MRE
dd. TSX:SRJ, Spearmint Resources, McGee MRE, June 2022
ee. ASX:INR, Ioneer, Rhyolite Ridge SEC S-K 1300 Technical Report, April 2026
ff. NYSE:ALB, Albermarle Corporation, Kings Mountain/Silve Peak SEC Form 10-K FY2023
gg. AIM:BHL, Bradda Head Lithium, Basin MRE, July 2024
32 Fulcrum Lithium Ltd 2026 Annual Report
Review of Operations
No material changes
The Company confirms it is not aware of any new information or data that materially affects the information
included in this report and that all material assumptions and technical parameters underpinning the
Exploration Results and Mineral Resource estimates,
Share your feedback
Discover