ALKALI FLATS PROJECT UPDATE
The Directors of Fulcrum Lithium Ltd (ASX: FUL, Fulcrum or the Company) announce the
completion of the Phase 1 drilling campaign at the Company’s Alkali Flats project in Esmeralda
County, Nevada, USA (Figure 1).
This drilling program is the first time the Alkali Flats project area has been drilled, providing valuable
three-dimensional data to apply to the large Alkali Flats basin covered by Fulcrum’s claims. Phase
1 drilling data will guide Fulcrum’s geological team to target other prospective areas around the
basin. The data from the prior rock chip sampling and drilling programs indicate further prospectivity
both west and north of the Phase 1 drilling area.
The drilling program, comprising 14 Reverse Circulation (RC) drill holes averaging 171m depth on a
grid spacing of approximately 800 metres (Figure 2), was designed to test the Siebert Formation;
the regional claystone host for lithium (Li) deposits and in a location where Fulcrum’s initial surface
sampling results returned lithium concentrations up to 797 ppm Li (see Figure 2).
The presence of lithium mineralisation greater than 300ppm Li is an encouraging start to Fulcrum’s
exploration program. These results confirm that there are significant mineralised intervals of Seibert
Formation claystone and that a robust lithium mineralisation system is present at Fulcrum’s Alkali
Flats project. Siebert Formation claystones host in excess of 60 million tonnes of reported lithium
carbonate equivalent resources at several deposits in nearby third party projects.
In summary:
Alkali Flats Phase 1 drilling program has been completed.
14 drill holes were drilled to an average depth of 171m for 2,393m in total.
Drilling confirms that Alkali Flats covers a claystone-hosted lithium mineralisation system.
Lithium mineralisation above 300ppm Li has been intersected in 8 of the 14 holes, including:
o
o
AFRC-3:
AFRC-4:
and
o AFRC-7:
o AFRC-1:
21.3m @ 507ppm Li with internal values up to 617ppm Li
13.7m @ 471ppm Li with internal values up to 594ppm Li
9.1m @ 770ppm Li with internal values up to 919ppm Li
15.2m @ 360ppm Li with internal values up to 450ppm Li
6.1m @ 454ppm Li with internal values up to 490ppm Li
A geological mapping and surface sampling program has commenced at the Alkali Flats, Fairway
and Summit projects. Consistent with the data from the Phase 1 drilling program, initial observations
from the surface sampling at Alkali Flats have delineated other targets west of the Phase 1 drilling
area.. The second phase of drilling at Alkali Flats is scheduled to be conducted in Q2 2025 focussing
on these targets.
Scott Keenan, COO, commented:
“Fulcrum’s maiden exploration drilling program to test the prospectivity of our first project area, Alkali
Flats, has returned some initial encouraging results with confirmation of a working claystone-hosted
lithium mineralisation system across multiple intervals. We are following up these encouraging
results by expediting a comprehensive surface mapping and sampling program which, together with
the knowledge from the maiden drilling campaign at Alkali Flats, will aid in the design of our Phase
2 drilling program planned to commence in Q2 2025.”
Figure 1. FULCRUM’S PROJECT LOCATIONS
DRILLING PROGRAM
The Alkali Flats Phase 1 drilling program commenced on 10 December 2024, drilling the first 8 holes
before pausing operations on 23 December 2024. Drilling re-commenced on 7 January 2025,
completing the final 6 holes before de-mobilising operations on the 21 January 2025.
Phase 1 drilling tested Exploration Target Area No. 1 at the Alkali Flats project, where the Siebert
Formation and main host lithology in the region, is partially exposed and found to contain anomalous
lithium values. Fulcrum’s initial surface sampling results have measured lithium concentrations up
to 797 ppm Li with over 14 samples returning greater than 300 ppm Li (Figure 2).
2
Figure 2. ALKALI FLATS PHASE 1 DRILLING PROGRAM
All 14 holes intersected the Seibert Formation at shallow depths, on average at 6m depth with a
maximum alluvial overburden of 14m being intercepted. Drilling shows that the Seibert Formation
geology comprises an interbedded mixture of claystones, volcanic tuffs, tuffaceous volcaniclastic
sands and gravels. A weathered and fresh basalt flow was commonly intersected in a number of
holes which correlates to the Mira Basalt which is known to be present locally in the Seibert
Formation.
The thickness of claystones intersected in the Seibert Formation in the 14 holes ranges from 0m to
71.1m, averaging 26.7m and can be generally correlated in a lower and an upper zone (Figure 3).
3
Table 1 is a list of the drill holes completed and their coordinates using NAD 83 Zone 11 datum.
Table 1. ALKALI FLATS PHASE 1 DRILL HOLE LOCATIONS AND DEPTH
Drill Hole ID
Easting
Northing
Elevation
(M)
Total Depth
(M)
AFRC-1
AFRC-2
480568
4185258
1581
128.0
481354
479982
4184335
4185235
1600
1574
131.1
172.2
479608
480493
4184480
4184399
1585
1595
175.3
213.4
481342
480497
479182
4183633
4183616
4186900
1615
1595
1545
105.2
228.6
141.7
AFRC-10
479183
479368
4186899
4183616
1543
1584
141.7
105.2
AFRC-11
AFRC-12
479223
480494
4185291
4182820
1564
1610
180.3
227.0
AFRC-13
AFRC-14
481295
4182791
1612
475.0
482534
4181879
1616
228.0
2,393.0
AFRC-3
AFRC-4
AFRC-5
AFRC-6
AFRC-7
AFRC-8
AFRC-9
TOTAL
TRACK MOUNTED RC DRILL RIG ON SITE AT ALKALI FLATS
4
Assays for the 14 holes have been received and confirm that 8 out of the 14 holes intersected zones
of elevated lithium mineralisation, above 300ppm.
The full table of significant lithium assay results can be found in Table 2. The highest zones
intersected are highlighted as:
AFRC-3: 21.3m @ 507ppm Li with internal values up to 617ppm Li
AFRC-4: 13.7m @ 471ppm Li with internal values up to 594ppm Li
and
9.1m @ 770ppm Li with internal values up to 919ppm Li
AFRC-7: 15.2m @ 360ppm Li with internal values up to 450ppm Li
AFRC-1: 6.1m @ 454ppm Li with internal values up to 490ppm Li
Table 2. ASSAY RESULTS SHOWING ZONES ABOVE 300PPM Li
Drill Hole
ID
AFRC-1
AFRC-2
and
AFRC-3
AFRC-4
and
AFRC-5
From
(m)
24.4
1.5
To
(m)
33.5
3.0
Length
(m)
9.1
1.5
Li
(ppm)
427
304
66.5
103.6
67.1
124.9
1.6
21.3
457
507
6.1
19.8
13.7
471
137.2
1.5
146.3
4.6
9.1
3.1
771
353
44.2
No zones > 300PPM
59.4
15.2
360
AFRC-6
AFRC-7
AFRC-8
AFRC-9
AFRC-10
and
AFRC-11
AFRC-12
AFRC-13
AFRC-14
No zones > 300PPM
16.8
No zones > 300PPM
18.3
1.5
432
24.4
79.2
25.9
85.3
336
335
1.5
6.1
No zones > 300PPM
No zones > 300PPM
No zones > 300PPM
5
Figure 3. CROSS SECTION OF SELECTED ALKALI FLATS PHASE 1 DRILL HOLES
DISPLAYING INTERCEPTED LITHOLOGIES AND LITHIUM CONCENTRATION
(15X VERTICAL EXAGGERATION)
Re-commencement of drilling at the Alkali Flats project with the Phase 2 program is planned for Q2
2025, following the integration of all Phase 1 drilling data and geological interpretations and the
completion of permitting processes.
GEOLOGICAL MAPPING PROGRAM
On completion of the Phase 1 drilling program, a team of Fulcrum geologists have been mobilised
to site to commence a comprehensive geological mapping and sampling program across the full
230km2 of claims holdings including the Alkali Flats, Fairway and Summit projects.
The geological mapping results will be incorporated along with the full set of drilling results and
geological interpretation from Phase 1 drilling, to plan the Phase 2 drilling program scheduled for Q2
2025.
6
About Fulcrum Lithium Ltd
Fulcrum Lithium Ltd (ASX: FUL) listed on the ASX on 22 November 2024, to explore the largest
lithium exploration lode claim holding area by a company, of approximately 230 km2, in the heart of
Nevada’s ‘lithium belt’ which hosts Albemarle Corporation’s (NYSE: ALB) Silver Peak lithium mine,
the only lithium producing mine in the USA.
Fulcrum’s three projects, Alkali Flats, Summit and Fairway are proximate to, or on trend with,
significant lithium projects at various stages of exploration and development in a geologic setting
with demonstrated success and a mining friendly jurisdiction.
For further information, please contact:
Scott Keenan
Chief Operating Officer
Fulcrum Lithium Ltd
+61 2 9300 3377
This announcement has been authorised for release by the Company Secretary.
Competent Person’s Statement
The information in this Report that relates to Exploration Results and Exploration Targets is based on, and
fairly represents, information and supporting documentation prepared by Mr Bill R. Fleshman of Global
Geological Services, LLC, a geologist who is a Fellow and Chartered Professional of the Australasian Institute
of Mining and Metallurgy and (FAusIMM CP Geology #107342) and has sufficient experience which is relevant
to the style of mineralisation and type of deposit under consideration and to the activities which are being
undertaken to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Fleshman is an independent
consulting geologist and consents to the inclusion of the Exploration Results and Exploration Targets and
supporting information in the form and context in which it appears.
pjn12512
7
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data – Alkali Flats
Criteria
Sampling
techniques
Drilling techniques
Drill sample
recovery
Logging
Sub-sampling
techniques and
sample
preparation
JORC Code explanation
Commentary
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of
detailed information.
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
The RC drill cuttings samples were acquired every five feet
(1.524 meters) collected from fluid and cuttings passed through
a cyclone sample collector. Buckets were lined with pre-labelled
bags. Sample bags and chip trays were pre-labelled for field
staff. A Fulcrum geologist collected the samples or trained the
rig sampler in methods. Field personnel monitored the drilled
depth, and drilling was briefly paused at the end of each sample
run to circulate the cuttings to surface. Each sample interval was
logged at the rig by the supervising geologist. Samples were
stored at the drill sites until pickup.
If core, whether cut or sawn and whether quarter, half
or all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
Drill cuttings samples were initially collected wet and
subsequently partially dried out under natural conditions onsite. QA/QC samples (blanks, standards, field duplicates) were
submitted to monitor laboratory performance. Sample size is
appropriate for the planned analyses.
8
Reverse circulation (RC) drilling. The RC drilling was performed
by a 1500MPD track rig with a 5 3/4" (14.61 cm) hammer drill
bit.
Drill cuttings samples were collected every five feet in a cloth
bag inside a 5-gallon bucket from fluid and cuttings passed
through a cyclone sample collector.
Cuttings samples were qualitatively logged and photographed
by drilllsite geologists.
Criteria
Quality of assay
data and
laboratory tests
JORC Code explanation
Commentary
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
Samples were analyzed by American Assays Laboratories Inc. of
Sparks, Nevada by method 4AB DIGESTION: IO-4AB12 which is
an ICP-MS method employing a 4 acid + boric acid digestion.
Assay quality was monitored using pulp blanks, as well as
certified reference materials (CRMs). CRM’s were purchased
from Shea Clark Smith/MEG, Inc. The “MEG” standards are
produced form Esmeralda County claystones. CRM’s are
submitted by the site geologist at a rate of 1 in 40 samples. Pulp
blank results indicated no material contamination of samples
from sample preparation or during the analytical process. CRM
results were within 3 standard deviations of certified values. No
systematic bias nor other accuracy related issues were
identified.
Fulcrum’s QAQC procedure in addition to submitting CRM’s,
Blanks were submitted at a rate of 1 in 40 samples. Duplicate
splits were also submitted also at a rate of 1 in 40 samples.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Location of data
points
Data spacing and
distribution
Orientation of
data in relation to
geological
structure
Sample security
Audits or reviews
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
The measures taken to ensure sample security.
The results of any audits or reviews of sampling
techniques and data.
9
Sample intervals were assigned a unique sample identification
number prior to sample dispatch.
Lithium-mineralised claystone Certified Reference Materials
(standards), duplicates and blanks were inserted into the sample
stream at regular intervals to monitor lab accuracy and potential
contamination during sample prep and analytical processes.
Fulcrum geologists used handheld Garmin GPS units to record
sample location sites and as QC. Fulcrum geologists have
recorded the sample sites using NAD 83 Zone 11 datum.
Location of data points is considered to be at acceptable levels
of accuracy and precision.
Drill holes were spaced approximately 800m apart on average,
ranging from 650m to 1600m. The spacing is considered
adequate for this stage of exploration given the flat to
moderately dipping sedimentary layers.
Drill holes were drilled vertical achieving unbiased sampling of
the underlying structure. The stratigraphy comprises flat,
bedded, mostly sedimentary layers.
RC samples remained in the custody of Fulcrum onsite at the
drill rig until collected by American Assay Laboratory personnel
and transported securely to their laboratory. Samples were
accompanied by submittal sheets. No security issues are
suspected.
No audits or reviews of the data management system have been
carried out.
Section 2 Reporting of Exploration Results
Criteria
Mineral tenement
and land tenure
status
JORC Code explanation
Commentary
Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness
or national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
license to operate in the area.
The Fulcrum Projects are 100% owned by Fulcrum and are in the
form of 2,763 unpatented US lode claims located on Federal Land
administered by the US Bureau of Land management (BLM).
Alkali Flats Project – 2,276 lode claims (A1 - A961, B1 - B953 and C1 C362) is centred near 469,342 metres East, 4,187,705 metres North,
Universal Transverse Mercator (UTM) NAD 83, Zone 11 datum in
Esmeralda County, Nevada.
The Summit Project – 160 lode claims (D1 - D160) is centred near
482,165 metres East, 4,169,952 metres North, Universal Transverse
Mercator (UTM) NAD 83, Zone 11 datum in Esmeralda County,
Nevada.
The Fairway Project – 327 lode claims (S1 - S327) is centred near
414,540 metres East, 4,195,755 metres North, Universal Transverse
Mercator (UTM) NAD 83, Zone 11 datum in Esmeralda County,
Nevada.
The lode claims require an annual filing of an Intent to Hold
declaration and are subject to annual Maintenance Fee payments to
the BLM and Esmeralda County totalling US$200 per claim. Surface
rights sufficient to explore, develop and mine minerals on the
unpatented lode claims are inherent to the claims provided the
claims are maintained in good standing. The surface rights are
subject to all applicable State and Federal environmental
regulations.
There has not been previous exploration for lithium at the Alkali
Flats Project.
Exploration done
by other parties
Geology
Drill hole
Information
o
o
o
o
o
Acknowledgment and appraisal of exploration by other
parties.
Deposit type, geological setting and style of
mineralisation.
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of the
report, the Competent Person should clearly explain why
this is the case.
10
The Fulcrum Projects are in areas favourable for claystone hosted
lithium deposits. Project areas were selected based on the presence
of favourable host lithologies within hydrogeological closed basins
that also exhibited high geothermal activity. Fulcrum’s Projects are
geologically similar to other nearby lithium projects in the Tonopah
area with advanced exploration programs. Several of those projects
are currently being investigated at various exploration or
development stages all based primarily on the United States
Geological Survey (USGS) lithium depositional model as presented
by Asher-Bolinder (1991) in which three diagenetic models are
proposed for formation of enriched lithium clays in closed basins:
Alteration of volcanic glass to lithium-rich smectite.
Precipitation from lacustrine waters.
Incorporation of lithium into existing smectites.
A total of 14 holes planned at the Alkali Flats project were
completed for a total of approximately 2,367 metres.
All holes were drilled vertically and drill hole coordinates and the
depth of each hole are detailed in the report above.
Criteria
JORC Code explanation
Data aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
Commentary
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually material and should be stated.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Intersections, where quoted are weighted by length.
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
The Seibert formation is generally flat ( <5 degrees) in the drilled
target. All holes are vertical, therefore all reported mineralization
widths will be very similar to the interception lengths quoted and
the difference will be negligible.
Spot grades also quoted for single drill sample intervals of the
highest values within quoted zones.
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
The intersection lengths of zones over the 300ppm Li cut-off was
published for all holes in the 14 hole drill program.
Other substantive
exploration data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
The nature and scale of planned further work (eg tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
N/A – no other material exploration data was gathered in this
period.
Further work
11
A 300ppm Li cut-off was used to quote headline intersections, with
allowance for 5ft of internal dilution by lower grade material.
Appropriate diagrams are included in the ASX announcement.
A comprehensive geological mapping program of Fulcrum’s Alkali
Flats, Summit and Fairway projects has commenced. Phase 2 of the
Alkali Flats drill program is planned to commence in Q2 2025
following Phase 1 completion and incorporation of Phase 1 results
for operational planning.