Alkali Flats Metallurgy Update
Released
Released
Announcement PDF
19 May 2026
ALKALI FLATS METALLURGY UPDATE
• Positive lithium extraction results at ambient temperatures and short leach times:
o 93% - 96% lithium recovery from 7 day mini-column acid cured leach tests.
Over 80% lithium recovery within 72 hours.
o 57% - 66% lithium recovery from 1 hour water leaching at ambient temperature after
roasting samples with optimal gypsum and limestone blend ratios.
• Successful initial test of a potential low cost heap leaching processing pathway.
• Successful test of the viability of calcination roasting and water leaching process to add to
the previous successful test of sulfuric acid leaching process, providing further flexibility of
processing options.
• Encouraging initial test results from beneficiation techniques:
o Hydrocyclone testing reduced mass by up to 41%, removed up to 54% of carbonates
and increased grade by up to 27%.
o Alcohol screening reduced mass by up to 15%, removed up to 30% of carbonates and
increased grade by up to 12%.
• The next phase of metallurgical test work has commenced on core from the Alkali Flats Phase
3 drilling program further refine the potential low cost heap processing pathway.
The Directors of Fulcrum Lithium Ltd (ASX: FUL, Fulcrum or the Company) are pleased to
announce the ongoing results of the scoping metallurgical program at the Company’s 100% owned
Alkali Flats project in Esmeralda County, Nevada, USA (Figure 1).
Following the success of the first series of tests in the Company’s initial metallurgical program1
, 3
composite samples from the 8 composite samples in that program were selected for further testing
by Kappas, Cassiday and Associates (KCA) in Reno, Nevada focused on beneficiation and leaching
techniques.
The composite samples were constructed from cuttings samples taken every 1.5m over broad, 30m
zones of varying lithium (Li) grades from 3 reverse circulation (RC) drill holes, AF2-2, AF2-5 and
AF2-10, completed during the Alkali Flats Phase 2 drill program and returned average lithium grades
up to 674ppm Li.
The further metallurgical test work conducted by KCA included hydrocyclone separation, alcohol
screening and roast calcination followed by water leaching. These tests were designed to gain a
further understanding of the leachability of the Alkali Flats lithium bearing claystones, to compare
the performance of different clay zones within the project, to analogue other nearby claystone
projects and to guide and accelerate a more detailed metallurgical program from drill core from the
current Phase 3 drilling program.
Scott Keenan, COO, commented:
“The metallurgical work on the Alkali Flats lithium claystones continue to provide very positive results.
Not only are the lithium extraction results high, but the test work continues to open potential pathways
for fast, low temperature and low cost processing as we rapidly learn about the properties of the
Company’s significant lithium claystone discovery. This scoping metallurgical program is setting an
exciting foundation as we design our more detailed metallurgical work on our large Phase 3 dataset
including diamond drill core.”
2
Alkali Flats Project
The Company owns a 100% interest in the Alkali Flats lithium project comprising 802 lode claims
(approximately 66km2
) located within the Esmeralda County on Federal public lands owned and
administered by the United States government. The project is situated approximately 15km south of
the Tonopah Flats (American Battery Technology Company) and TLC (American Lithium
Corporation) lithium projects and 10km east of the Silver Peak (Albemarle Corporation) lithium mine,
the only operating lithium mine in the USA (Figure 1).
Figure 1. FULCRUM’S ALKALI FLATS PROJECT LOCATION
Metallurgical Program Results
The Alkali Flats Phase 2 RC drilling program resulted in the discovery of significant lithium
mineralised claystones (>300ppm) intercepted in all holes that penetrated the Siebert Formation,
displaying significant grade, thickness and lateral extent2
.
As previously reported, a scoping level metallurgical program, using Phase 2 RC cuttings was
conducted. Zones of up to 30 metres were selected across 5 drill holes from the Phase 2 RC drilling
program, representing higher grade, lower grade zones and 2 control zones. Samples across each
zone were composited to represent the average properties over the broader 30m zone.
Results within this announcement are related to Zone 2 (AF2-2), Zone 6 (AF2-5) and Zone 8 (AF2-
10). Samples were run through the analytical process by KCA in a workflow that included
hydrocyclone separation, alcohol screening, roast calcination followed by water leaching and mini-
column heap leaching.
Table 1. LOCATION OF ZONES TESTED
Hole
ZONE 2
AF2-2
ZONE 6
AF2-5
ZONE 8
AF2-10
Depth From (m) 183 53 52
Depth To (m) 213 83 82
Lithium (ppm) 652 674 592
3
Figure 2. ALKALI FLATS PHASE 2 AND 3 COMPLETED DRILLING PROGRAM
Alcohol Screening
The clay samples were wet screened using isopropyl alcohol with a 0.020mm size screen to separate
the solids by particle size. The undersized and oversized fractions were dried, weighed, and assayed
to determine the degree of separation of lithium bound in clay particles, carbonates, which are a
major acid consumer, and the reduction in mass.
Hydrocyclone Separation
A laboratory scale hydrocyclone (25mm diameter) was used to separate the 5% solid clay slurry by
density. The underflow and overflow fractions were dried, weighed and assayed to determine the
degree of separation of lithium bound in clay particles, carbonates which are a major acid consumer
and the reduction in mass.
Roast Calcination and Water Leach
Clay samples were pulverized and pelletized with varying blend ratios of gypsum, limestone using
water. The pellets were roasted at 1,000°C for 1 hour at atmospheric pressure. The pellets were
water leached with agitation for 1 hour. The leachate and the tailings were assayed to determine the
percentage of lithium that was extracted from the clay pellets.
4
Mini-Column Tests
Clay samples were pelletized and sulfuric acid cured. 1kg of pellets was placed in a 75mm diameter
column under a diluted sulfuric acid drip for 7 days. The leachate and clay tailings were assayed to
determine the percentage of lithium that was extracted from the clay pellets. Measurements of the
leachate solution were taken every 24 hours to track the progress of clay material lithium extraction.
Table 2. BENEFICIATION AND LEACHING TESTS RESULTS SUMMARY
Figure 3. 7 DAY MINI-COLUMN LEACH RESULTS
AF2-2 (Zone 2) AF2-5 (Zone 6) AF2-10 (Zone 8)
Mass Reduction 12% 15%
Carbonate Reduction 30% 10%
Grade Increase 12% 11%
AF2-2 (Zone 2) AF2-5 (Zone 6) AF2-10 (Zone 8)
Mass Reduction 26% 29% 41%
Carbonate Reduction 53% 54% 41%
Grade Increase 15% 13% 27%
AF2-2 (Zone 2) AF2-5 (Zone 6)
Lithium Extraction Roast Blend A Roast Blend B Roast Blend C
66% 59% and 57% 30% and 12%
AF2-2 (Zone 2) AF2-5 (Zone 6) AF2-10 (Zone 8)
Lithium Extraction 95% 96% 93%
Not Run Not Run
Not Run
Roast Calcination and Water Leach
7-Day Mini Column Leach
AF2-10 (Zone 8)
Alcohol Screening
Hydrocyclone Separation
5
Alkali Flats Project Metallurgical Forward Plan
Data from this initial scoping level metallurgical testing program for the Alkali Flats Phase 2 RC
drilling program will be used as input for the testing and metallurgical program planning on Phase 3
core and cuttings material which has commenced.
References
1. ASX announcement 19 November 2025 ‘Alkali Flats Initial Metallurgy Results’
2. ASX announcement 24 September 2025 ‘Alkali Flats Project Update – Lithium Discovery’
No Material Changes
The Company confirms it is not aware of any new information or data that materially affects the information
included in this report and that all material assumptions and technical parameters underpinning the Exploration
Results in this announcement continue to apply and have not materially changed
Competent Person’s Statement
The information in this Report that relates to Exploration Results is based on, and fairly represents, information
and supporting documentation prepared by Mr Bill R. Fleshman of Global Geological Services, LLC, a
geologist who is a Fellow and Chartered Professional of the Australasian Institute of Mining and Metallurgy
and (FAusIMM CP Geology #107342) and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activities which are being undertaken to
qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Fleshman is an independent consulting
geologist and consents to the inclusion of the Exploration Results and supporting information in the form and
context in which it appears.
Authorisation
This announcement has been authorised for release by the Board of Directors.
About Fulcrum Lithium Ltd
Fulcrum Lithium Ltd (ASX: FUL) is a lithium exploration company focused in Nevada, the leading
lithium mining and exploration state in the USA.
Fulcrum’s Alkali Flats discovery is proximate to, and on trend with, significant lithium projects at
various stages of exploration and development in a geologic setting with demonstrated success and
a mining friendly jurisdiction.
For further information, please contact:
Scott Keenan
Chief Operating Officer
Fulcrum Lithium Ltd
+61 2 9300 3377
pjn12933
6
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data – Alkali Flats Phase 2 Scoping Metallurgy
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of
detailed information.
The RC drill cuttings samples were acquired every five feet
(1.524 metres) collected from fluid and cuttings passed through
a cyclone sample collector. Buckets were lined with pre-labelled
bags. Sample bags and chip trays were pre-labelled for field
staff. A Fulcrum geologist collected the samples or trained the
rig sampler in methods. Field personnel monitored the drilled
depth, and drilling was briefly paused at the end of each sample
run to circulate the cuttings to surface. Each sample interval was
logged at the rig by the supervising geologist. Samples were
stored at the drill sites until pickup.
RC samples were weighed, dried, combined and pulverised to
form composite samples over intervals up to 30m wide for
metallurgical testing.
Drilling techniques Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Not applicable for metallurgical reporting.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Not applicable for metallurgical reporting.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
Not applicable for metallurgical reporting.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half
or all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
Not applicable for metallurgical reporting.
7
Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
Samples were analysed by Kappas Cassiday and Associates. of
Reno, Nevada by a number of different industry standard
techniques including below;
• 4-Acid, ICP-OES
• LECO,
• Quantitative X-ray Diffraction (QXRD) + CEC -
FLSMIDTH
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Sample intervals were assigned a unique sample identification
number prior to sample dispatch.
Lithium-mineralised claystone CRMs, duplicates and blanks were
inserted into the sample stream at regular intervals to monitor
lab accuracy and potential contamination during sample prep
and analytical processes.
Location of data
points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Fulcrum geologists used handheld Garmin GPS units to record
sample location sites and as QC. Fulcrum geologists have
recorded the sample sites using NAD 83 Zone 11 datum.
Location of data points is considered to be at acceptable levels
of accuracy and precision.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Drill holes were spaced 1500m-2500m apart. The spacing is
considered adequate for this stage of exploration given the flat
to moderately dipping sedimentary layers.
Orientation of
data in relation to
geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Drill holes were drilled vertical achieving unbiased sampling of
the underlying structure. The stratigraphy comprises flat,
bedded, mostly sedimentary layers.
Sample security The measures taken to ensure sample security. RC samples remained in the custody of Fulcrum onsite at the
drill rig until collected by American Assay Laboratory personnel
and transported securely to their laboratory. Samples were
accompanied by submittal sheets. No security issues are
suspected. RC samples were stored at AAL prior to dispatch to
KCA laboratories.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
No audits or reviews of the data management system have been
carried out.
8
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness
or national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
license to operate in the area.
The Fulcrum Projects are 100% owned by Fulcrum and are in the
form of 802 unpatented US lode claims located on Federal Land
administered by the US Bureau of Land management (BLM).
Alkali Flats Project – 802 lode claims centred near 469,342 metres
East, 4,187,705 metres North, Universal Transverse Mercator (UTM)
NAD 83, Zone 11 datum in Esmeralda County, Nevada.
The lode claims require an annual filing of an Intent to Hold
declaration and are subject to annual Maintenance Fee payments to
the BLM and Esmeralda County totalling US$200 per claim. Surface
rights sufficient to explore, develop and mine minerals on the
unpatented lode claims are inherent to the claims provided the
claims are maintained in good standing. The surface rights are
subject to all applicable State and Federal environmental
regulations.
Exploration done
by other parties
Acknowledgment and appraisal of exploration by other
parties.
Not applicable as no exploration done by other parties is reported.
Geology Deposit type, geological setting and style of
mineralisation.
The Fulcrum Projects are in areas favourable for claystone hosted
lithium deposits. Project areas were selected based on the presence
of favourable host lithologies within hydrogeological closed basins
that also exhibited high geothermal activity. Fulcrum’s Projects are
geologically similar to other nearby lithium projects in the Tonopah
area with advanced exploration programs. Several of those projects
are currently being investigated at various exploration or
development stages all based primarily on the United States
Geological Survey (USGS) lithium depositional model as presented
by Asher-Bolinder (1991) in which three diagenetic models are
proposed for formation of enriched lithium clays in closed basins:
Alteration of volcanic glass to lithium-rich smectite.
Precipitation from lacustrine waters.
Incorporation of lithium into existing smectites.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of the
report, the Competent Person should clearly explain why
this is the case.
A total of 10 holes planned at the Alkali Flats project were
completed for a total of approximately 1666 metres.
All holes were drilled vertically and drill hole coordinates and the
depth of each hole are detailed in the report above.
9
Criteria JORC Code explanation Commentary
Data aggregation
methods
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually material and should be stated.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Not applicable for metallurgical reporting.
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
The Siebert Formation is generally flat (<5 degrees) in the drilled
target. All holes are vertical, therefore all reported mineralisation
widths will be very similar to the interception lengths quoted and
the difference will be negligible.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Appropriate diagrams are included in the ASX announcement.
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
Inclusion of results for all zones were published in this
announcement.
Other substantive
exploration data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
N/A – no other material exploration data was gathered in this
period.
Further work The nature and scale of planned further work (eg tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
Further work for the Alkali Flats Project is described in the
announcement.
Share your feedback
Discover